Similar Projects
Security Upgrades
Alteration
Bidding
Minneapolis, MN

Video Board Control Room Equipment for Huntington Bank Stadium
Alteration
Bidding
Minneapolis, MN 55414

Fixed Wireless Broadband
Post-Bid
North Branch, MN 55056

RFI - Home Intrusion Detection Systems (CONUS/OCONUS)
Post-Bid

County-Wide Access Control Upgrades
Results
Shakopee, MN 55379

Video Security Equipment
Results
Duluth, MN 55802

Water System SCADA and Control Improvements
Alteration
Bidding
Madelia, MN

Genetec Building Security Systems RFP
Term Contract
Post-Bid
Minneapolis, MN

Courtrooms 2 and 5 Technology Upgrades
Results
Less than $200,000 est. value
Shakopee, MN 55379

Unified Network Access
Alteration
Bidding
Rosemount, MN

Outdoor Warning Siren Maintenance
Term Contract
Post-Bid
Minneapolis, MN

Fiber Optic Cable Splicing
Term Contract
Results
$329,542 est. value
MN

Erate Category 1 and 2 Equipment and Services
Term Contract
Post-Bid
Moorhead, MN

SCADA Improvements, Phase II
Results
$1,580,000 est. value
Edina, MN

Security Cameras
Post-Bid
Apple Valley, Burnsville, Eagan, Farmington, Hastings, Inver Grove Heights, Lakeville, Rosemount, Saint Paul, South Saint Paul, West Saint Paul, MN 55306

Last Updated 12/29/2021 04:07 PM
Project Title

Fiber Interconnect Installation for Advanced Traffic Management System

Physical Address View project details and contacts
City, State (County) Prior Lake, Savage, Shakopee, MN   (Scott County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $611,711
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

C.S.A.H 16, 17, 21, 42, and 83 The project consists of boring conduit, fiber interconnect, TMS cabinet modifications, and traffic signal revisions Furnish, install, maintain, and remove all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvement 1. Approximately 13 Salvage Fiberoptic Splice/Patch Panel; 2. Approximately 600 Linear feet of 1.5” NMC conduit; 3. Approximately 20 Linear feet of 3” NMC conduit; 4. Approximately 150 Linear feet of CAT 6 cable; 5. Approximately 1 Install Fiber Optic Splice/Patch Panel; 6. Approximately 16 Each of fiber optic patch panel; 7. Approximately 20 Each of fiber optic pigtail termination; 8. Approximately 2 Each of core drilled hole; 9. Approximately 23 Each of pull vault; 10. Approximately 4535 Linear feet of fiber optic trunk cable (36SM); 11. Approximately 23930 Linear feet of fiber optic trunk cable (144SM); 12. Approximately 19965 Linear feet of 1.5” bored conduit; 13. Approximately 1 Revise Signal System

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents