Similar Projects
Last Updated | 12/29/2021 04:07 PM |
Project Title | Fiber Interconnect Installation for Advanced Traffic Management System |
Physical Address | View project details and contacts |
City, State (County) | Prior Lake, Savage, Shakopee, MN (Scott County) |
Category(s) | Single Trades |
Sub-Category(s) | Security/Communications |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $611,711 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | C.S.A.H 16, 17, 21, 42, and 83 The project consists of boring conduit, fiber interconnect, TMS cabinet modifications, and traffic signal revisions Furnish, install, maintain, and remove all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvement 1. Approximately 13 Salvage Fiberoptic Splice/Patch Panel; 2. Approximately 600 Linear feet of 1.5” NMC conduit; 3. Approximately 20 Linear feet of 3” NMC conduit; 4. Approximately 150 Linear feet of CAT 6 cable; 5. Approximately 1 Install Fiber Optic Splice/Patch Panel; 6. Approximately 16 Each of fiber optic patch panel; 7. Approximately 20 Each of fiber optic pigtail termination; 8. Approximately 2 Each of core drilled hole; 9. Approximately 23 Each of pull vault; 10. Approximately 4535 Linear feet of fiber optic trunk cable (36SM); 11. Approximately 23930 Linear feet of fiber optic trunk cable (144SM); 12. Approximately 19965 Linear feet of 1.5” bored conduit; 13. Approximately 1 Revise Signal System |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |