Similar Projects
Dry Creek Regional Detention Pond Phase 2
Post-Bid
$844,430 est. value
Rosenberg, TX

Water, Sanitary Sewer, Drainage, and Paving Facilities for Sterling Lakes Drive Street Dedication
Post-Bid
TX

Construction of Long Meadow Farms Section 46, Phase 1A Water, Sewer, and Drainage Improvements
Results
TX

OP Schnabel Park Entrance and Bridge
Results
$783,000 est. value
San Antonio, TX

Police Training Facility - Berm Improvements
Construction
Less than $2,200,000 est. value
Conroe, TX 77301

Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

Bass Lodge Retaining Wall Repair at Daingerfield State Park
Results
$136,600 est. value
Daingerfield, TX 75638

Sims Bayou Harvey Repairs, Harris County, Texas
Post-Bid
TX

Sabine River Authority Lake Tawakoni Spillway Channel Bank Stabilization
Results
$2,800,000 est. value
Wills Point, TX 75169

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

Provide Super 2 Passing Lanes
Results
Less than $17,743,517 est. value
TX

Ford High School Drainage
Post-Bid
Quinlan, TX 75474

Construction of River Ranch Detention Pond A, B, and C
Results
Houston, TX

E Lantrip Channel Outfall Improvements
Post-Bid
$80,000 est. value
Kilgore, TX 75662

Jones Creek Slope Rehabilitation
Results
Less than $13,998,075 est. value
Houston, TX

Reported 07/08/2021 12:00 AM
Project Title

Tract 2F Drainage - Phase 1

Physical Address View project details and contacts
City, State (County) TX   (Chambers County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work of the Contract includes clearing, grading and construction of 4 detention ponds (approximately 33 -AC surface area), construction of 2 drainage channels (approximately 800 linear feet) within the proposed development, and installing associated storm sewer infrastructure (culverts/pipes, interceptor swales, and maintenance berms).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents