Similar Projects
David Prouty High School
Renovation, Addition
Conception
$30,000,000 to $50,000,000 est. value
Spencer, MA 01562

Roof Repairs - Marion E. Zeh Elementary School - Town of Northborough
Renovation - 20,000 SF
Conception
$2,000,000 CJ est. value
Northborough, MA 01532

New Doherty Memorial High School - Concrete / Steel Package
Addition, Demolition, New Construction, Renovation, Infrastructure - 421,858 SF
Design
$240,000,000 CJ est. value
Worcester, MA 01602

Addition of an accessible toilet room on the first floor of the Borger Building at Leicester High S
Addition, Demolition, Renovation, Infrastructure
Bidding
$385,000 CJ est. value
Leicester, MA 01524

OEA Office Renovation - General Bids
Renovation
Post-Bid
$225,000 est. value
Worcester, MA 01655

Nursery School Fire Alarm (Project) (Re-bid)
Renovation
Post-Bid
$50,000 CJ est. value
Sturbridge, MA 01518

Underground Waterproofing - Doherty Memorial High School
New Construction - 421,858 SF
Results
$238,000,000 est. value
Worcester, MA 01602

Outdoor Classrooms Project
New Construction
Results
$105,000 est. value
Millbury, MA 01527

Renovations to the Learning First Charter Public School
Renovation
Construction
$15,705,908 est. value
Worcester, MA 01605

Water Heater and Boiler Replacement for Burncoat Junior and Senior High Schools - GC
Renovation
Construction
$755,150 CJ est. value
Worcester, MA 01609

Burncoat High School Replacement - Worcester Public Schools
Demolition, New Construction, Infrastructure
Pending Verification
$370,000,000 CJ est. value
Worcester, MA 01608

Flat Roof Area Replacement - Proctor Elementary - Northborough Public Schools
Renovation
Conception
$1,550,000 CJ est. value
Northborough, MA 01532

The Relocation of School and Office Furniture, Technology, Teaching Materials, Reference Materials, Athletic and Food Service Equipment
Renovation
Post-Bid
$40,000 est. value
Worcester, MA 01605

MAAB Accessibility Upgrade Project - GC
Renovation
Results
$2,684,000 CJ est. value
Worcester, MA 01606

Watkins Field Building - Gardner High School - GC Bid
New Construction - 1,283 SF
Post-Bid
$300,000 est. value
Gardner, MA 01440

Last Updated 05/24/2023 04:22 PM
Project Title

Swanson Road Intermediate School Boiler Conversion - Sub

Physical Address View project details and contacts
City, State (County) Auburn, MA 01501   (Worcester County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $325,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Swanson Road Intermediate School Boiler Conversion.- Sub Estimated Cost $325,000 Download free electronic set or order hard copy set for $35 plus $50 deposit. The job site and/or existing building will be available for inspection on 5/19/23 @ 9:00 A.M. Bidders should meet outside the main entrance to the building (do not enter the school). Question Deadline 05/21/2023 Any and all questions regarding the Drawings, Specifications or Bid shall be directed, in writing by email, to the Project Architect, Steve VanDyke, Nault Architects, Inc. admin@naultarchitects.com. No exceptions. A. The work to be done under this contract consists of executing and completing all work required for the Swanson Road Intermediate School Boiler Conversion in Auburn Massachusetts. For this contract, the HVAC Contractor will be the Prime Contractor, responsible for management and sub-contracting of the complete project. B. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1. Replacement of existing oil-fired burners with new gas-fired burners. 2. Provide new gas-fired boiler and associated pumps. 3. Provide new indirect domestic hot water tank and associated pump and controls. 4. Furnish and Install temporary domestic hot water heater until the permanent system operates then remove. 5. New venting of existing and new boilers. 6. Update Owner's control system to integrate the new boiler, water heater and pumps. 7. Related electrical and plumbing work. C. The following major elements will be performed by the Owner, under separate contracts, for which the Prime Contractor has a coordinating responsibility: 1. The School District will remove the existing underground heating oil tanks, install the new underground propane tanks, extend gas piping up to the exterior of the building terminating with a valve, backfill the excavation and repave the disturbed area.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents