Similar Projects
Last Updated | 05/24/2023 04:22 PM |
Project Title | Swanson Road Intermediate School Boiler Conversion - Sub |
Physical Address | View project details and contacts |
City, State (County) | Auburn, MA 01501 (Worcester County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $325,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Swanson Road Intermediate School Boiler Conversion.- Sub Estimated Cost $325,000 Download free electronic set or order hard copy set for $35 plus $50 deposit. The job site and/or existing building will be available for inspection on 5/19/23 @ 9:00 A.M. Bidders should meet outside the main entrance to the building (do not enter the school). Question Deadline 05/21/2023 Any and all questions regarding the Drawings, Specifications or Bid shall be directed, in writing by email, to the Project Architect, Steve VanDyke, Nault Architects, Inc. admin@naultarchitects.com. No exceptions. A. The work to be done under this contract consists of executing and completing all work required for the Swanson Road Intermediate School Boiler Conversion in Auburn Massachusetts. For this contract, the HVAC Contractor will be the Prime Contractor, responsible for management and sub-contracting of the complete project. B. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1. Replacement of existing oil-fired burners with new gas-fired burners. 2. Provide new gas-fired boiler and associated pumps. 3. Provide new indirect domestic hot water tank and associated pump and controls. 4. Furnish and Install temporary domestic hot water heater until the permanent system operates then remove. 5. New venting of existing and new boilers. 6. Update Owner's control system to integrate the new boiler, water heater and pumps. 7. Related electrical and plumbing work. C. The following major elements will be performed by the Owner, under separate contracts, for which the Prime Contractor has a coordinating responsibility: 1. The School District will remove the existing underground heating oil tanks, install the new underground propane tanks, extend gas piping up to the exterior of the building terminating with a valve, backfill the excavation and repave the disturbed area. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |