Similar Projects
Group 4-17-ST 8
Infrastructure, Alteration
Conception
$5,114,012 est. value
Hawley, PA

I-95: Betsy Ross Main Lane NB
Infrastructure
Conception
$313,612,649 est. value
Philadelphia, PA 19176

Lower Allen Commons
New Construction
Design
Lower Allen, PA 17011

Blue Bell Mobile Home Park
New Construction
Design
Ephrata, PA 17522

AMR Forest City East
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Forest City, Harrisburg, PA

AMR Forest City East
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Forest City, Harrisburg, PA

Maia's Meadows - Infrastructure
New Construction
Post-Bid
Etters, PA 17319

College Avenue and Heister Street Sidewalk and Utility Upgrades
Renovation
Post-Bid
$662,219 est. value
University Park, PA 16802

New Borough Administration, Police and Community Center - All Site Work
New Construction
Results
Trainer, PA 19061

Nesquehoning Hose Company No. 1 Site Improvements
Results
Nesquehoning, PA 18240

Villanova University - St Mary`s Hall Gymnasium Pool Infill
Construction
Villanova, PA 19085

Loomis Roundabout Improvement Project
Construction
Ashley, PA 18701

Harmony Grove Rd Br PM
Renovation, Alteration
Conception
$3,375,680 est. value
Dover, PA 17315

Circle M RV Campground and Resort
Renovation
Design
Lancaster, PA 17603

Short Avenue Wastewater System Improvements - Site Improvement
Infrastructure
Bidding
Cresson, PA 16630

Reported 07/07/2022 12:00 AM
Project Title

Siteworks Requirements Contract

Physical Address View project details and contacts
City, State (County) East Stroudsburg, PA   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work for East Stroudsburg University includes, but is not necessarily limited to all labor, superintendence, materials, tools and equipment, and performing all work necessary to complete projects. It is the intention of the University to be able to have sitework performed on an as needed basis. The work may consist of the installation of new, or the replacement of existing, curbs, sidewalks, steps, inlets, manholes, paving, and line striping. The work may also include associated demolition, earthwork, and landscaping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents