Similar Projects
CTE Center - Phase 1 (Ag Science Center to House Animals)
New Construction - 20,000 SF
Conception
$8,205,000 est. value
College Station, TX

Trinity University Campus
New Construction, Renovation, Addition
Conception
$50,000,000 est. value
San Antonio, TX 78212

Satellite Utility Plant (SUP3) Expansion
Addition
Design
$20,930,520 est. value
College Station, TX 77840

Heep Laboratory Renovation
Renovation
Design
College Station, TX 77840

Raquel Gonzalez Automotive Techonology Center
Renovation
Bidding
Laredo, TX 78046

BA Renovate #339 into 5-6 Offices
Renovation
Bidding
Commerce, TX 75428

CMAR UH New Law Center
New Construction - 180,000 SF
Post-Bid
$60,000,000 to $72,000,000 est. value
Houston, TX 77204

LSC Montgomery Student Services Building
Post-Bid
The Woodlands, TX 77381

CMAR - New Recreation Center
New Construction - 23,760 SF
Results
$13,800,000 est. value
College Station, TX 77840

TSU DPS Restroom Renovations
Renovation
Results
Houston, TX 77004

CMAR PVAMU Engineering Classroom Research Bldg
New Construction - 101,987 SF
Construction
Less than $552,499,000 est. value
College Station, TX 77840

Dallas Baptist University Student Housing Phase III
New Construction - 10,500 SF
Construction
$2,200,000 est. value
Dallas, TX 75211

West Texas A&M Dorm Renovation
Renovation
Pending Verification
Canyon, TX 79016

Animal Reproductive Biotechnology Center Construction
New Construction
Pending Verification
$9,991,833 est. value
College Station, TX

Garrett TEC Renovation
Renovation
Conception
$4,876,000 est. value
Houston, TX

Last Updated 07/07/2022 07:53 AM
Project Title

New Second College Of Technology Building

Physical Address View project details and contacts
City, State (County) Sugar Land, TX   (Fort Bend County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Schematic Drawings
Bids Due View project details and contacts
Estimated Value $52,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

College/University, 80,000 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents