Similar Projects
RFQ Design - Multigenerational Community Resource Center
New Construction, Infrastructure
Conception
$26,400,000 CJ est. value
Surprise, AZ 85378

McKellips Road Natural Gas Line: Country Club to Loop 202 - CP0221 - City of Mesa
Infrastructure
Conception
Mesa, AZ 85205

District 6 St. John's Waste Water Treatment Facility Expansion and Lift Station Upgrade
Addition, Demolition, Renovation, Infrastructure
Design
$300,000 CJ est. value
Phoenix, AZ 85041

Dysart Road Sewer Replacement - Riley to Corral - U0045 - City of Avondale
Infrastructure
Design
$3,435,000 est. value
Avondale, AZ 85392

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

RFP D/B - Zone 6E Reservoir and Booster Pump Station (Design Build)
New Construction, Infrastructure
Bidding
$16,000,000 CJ est. value
Peoria, AZ 85345

City of Glendale (Various Locations)
Infrastructure
Sub-Bidding
$2,786,866 CJ est. value
Glendale, AZ 85301

Festival Ranch Planning Area 2 Infrastructure Effluent Line
Post-Bid
Sun City, AZ

Festival Ranch Parcel T1 16" Infrastructure Waterline
Post-Bid
Sun City, AZ

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Chandler Boulevard Waterline Replacement (Chippewa Place to Meadows Drive)
Results
$1,800,000 to $2,200,000 est. value
Chandler, AZ 85224

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

Glendale Mixed-Use Development
New Construction, Infrastructure - 540,000 SF
Pending Verification
$40,000,000 CJ est. value
Glendale, AZ 85345

Last Updated 08/04/2022 03:17 PM
Project Title

Grading and Drainage Project for Fuller Elementary

Physical Address View project details and contacts
City, State (County) Tempe, AZ 85283   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $127,600 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents