Similar Projects
11th Avenue south of Talmadge Street - 642444105 - City of Kearney
Infrastructure
Conception
$500,000 CJ est. value
Kearney, NE 68845

Mid-States Irrigation Building
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Center, NE 68847

Terminal Building Expansion - City of Kearney
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Kearney, NE 68847

The Catholic Newman Center
New Construction, Infrastructure - 24,000 SF
Design
$11,600,000 CJ est. value
Kearney, NE 68847

2023 Paving Improvements
Infrastructure
Bidding
$1,367,491 CJ est. value
Kearney, NE 68847

2023 Paving Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Kearney, NE 68847

Culverts, General (All Classes)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Kearney, NE 68847

Bridges, General (All Classes)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Beaver, NE 68869

2022 Part 2 Improvements - 56th Street & Avenue N Turning Lanes
Infrastructure
Results
$1,063,315 CJ est. value
Kearney, NE 68847

Midtown Office Building- 2022 Ave A Project
New Construction, Infrastructure
Results
$664,095 CJ est. value
Prairie Center, NE 68870

University Village Regional Engagement Center
Renovation - 52,969 SF
Construction
$15,600,000 CJ est. value
Kearney, NE 68845

UNK-UNMC Health Science Education Center II - BP Earthwork and Excavation
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Kearney, NE 68849

New Elementary School - Elm Creek Public Schools
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$11,980,000 CJ est. value
Elm Creek, NE 68836

Evergreen Road Paving - County of Buffalo
Infrastructure
Pending Verification
$250,000 CJ est. value
Kearney, NE 68847

Turkey Creek Fourth Subdivision
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Kearney, NE 68847

Last Updated 09/19/2023 01:59 PM
Project Title

UNK/UNMC Rural Health Education Building - BP Core and Shell (BP 5)

Physical Address View project details and contacts
City, State (County) Kearney, NE 68849   (Buffalo County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $65,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This is bid package 5 and will finish up the core and shell scopes. The scopes included in this bid package are as follows: Rebar Supply Foundations Building Flatwork Grouting Waterproofing Roofing Elevators Termite Control Utilities

Details

112,210 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents