Similar Projects
Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 CJ est. value
Urbandale, IA 50323

T Avenue Corridor Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Waukee, IA 50263

P-64 Cell D Liner and Greene County Landfill Improvements
Infrastructure
Post-Bid
Perry, IA 50220

RFQ Contractor - Dallas County Administration Building BP-02.01 Demolition Package
Demolition, New Construction, Infrastructure - 54,566 SF
Post-Bid
$20,000,000 CJ est. value
Adel, IA 50003

2020 Downtown Street and Utility Improvements
Infrastructure
Results
Perry, IA

Waukee Schools 2022 Playground Improvements
Infrastructure
Results
$1,059,745 CJ est. value
Waukee, IA 50263

Little Walnut Creek Headwaters Greenway
Renovation
Conception
$600,000 CJ est. value
Waukee, IA 50263

Rippey Water Main Replacement And Linden Water Main Replacement
Infrastructure
Post-Bid
$858,773 CJ est. value
Bouton, IA 50039

Highway 17 Utilities Extension - Rebid
Infrastructure
Results
$195,000 CJ est. value
Granger, IA 50109

Library BioRetention and Bioswale
Infrastructure
Conception
$2,100,000 CJ est. value
Waukee, IA 50263

2022 Water Main Replacement Perry Water Works
Infrastructure
Results
$596,592 CJ est. value
Perry, IA 50220

Waukee Public Library Stormwater
Infrastructure
Conception
$2,100,000 CJ est. value
Waukee, IA 50263

Raccoon River Valley Trail to High Trestle Trail Connector Phase V M Avenue To O Avenue Dallas County Conservation Board
Infrastructure
Results
$1,848,414 CJ est. value
Bouton, IA 50039

Aquifer Storage and Recovery - Waukee
Infrastructure
Conception
$4,500,000 CJ est. value
Waukee, IA 50263

Last Updated 07/05/2023 11:09 AM
Project Title

Ashworth West Extension

Physical Address View project details and contacts
City, State (County) Waukee, IA 50263   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $462,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for Grand Prairie Parkway Trunk Sewer Extension approx. 1,800 Ft; Southwest of GPP and SE Kettlestone Boulevard intersection. As of April 25, 2020, the project is in preliminary stage of planning. Information regarding design firm and general contractor selection or method of selection has not been disclosed. A construction timeline has not been released. it is currently unknown what approvals have been obtained. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. As of July 5, 2023, no new information available from city

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents