Similar Projects
Oak Harbor Intermediate School
New Construction, Renovation
Conception
Oak Harbor, WA 98277

White River High School
Renovation
Conception
$4,178,000 est. value
Buckley, WA

New Transition Services Educational Facility
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bellevue, WA

High School Addition
New Construction, Addition - 15,000 SF
Design
Ridgefield, WA

Renton High School Science Classrooms Modernization Project
Renovation
Bidding
Renton, WA 98057

Arletta Schoolhouse Renovation
Renovation
Bidding
Gig Harbor, WA 98335

Sacajawea Middle School Replacement
New Construction - 140,000 SF
Sub-Bidding
Spokane, WA 99203

ESD 112 Mental Health Center
Renovation
Post-Bid
$1,800,000 est. value
Vancouver, WA 98661

Avanti High School and Annex Remodel
Renovation
Post-Bid
Olympia, WA 98501

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Othello High School
New Construction, Renovation, Addition
Pending Verification
Othello, WA 99344

New Competition Gymnasium for Othello High School
New Construction
Pending Verification
Othello, WA 99344

Capital Projects Bond
Renovation, Addition
Conception
Bothell, WA

Lindbergh High School Networking Lab
New Construction
Bidding
$251,000 est. value
Renton, WA 98058

Last Updated 02/03/2022 09:29 AM
Project Title

Fort Vancouver High School Tenant Improvement

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98661   (Clark County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope consists of interior remodel of several areas within Fort Vancouver High School. A. FCRC (Family and Community Resource Center): Light demo and addition of a new office and casework B. New Classrooms: Demo of existing courtroom Dais and associated equipment. New wall dividing the space into two classrooms. New ceilings and lights and new teaching walls C. Locker Rooms: Demo of all existing lockers and showers. New lockers and benches, new paint and lights, new toilet partitions and 2 new individual ADA showers in each locker room. New floor covering in both locker rooms. D. Weight Room: Demolition of existing storage partitions, minor new wall framing, additional electrical outlets and paint. New project and white board in both the weight room and adjacent fitness studio. New mirrors in fitness studio.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents