Similar Projects
Transportation Research Building - University of Alabama
New Construction, Infrastructure
Conception
$16,500,000 CJ est. value
Tuscaloosa, AL 35401

Garner Road Cipp Line - 62240280 - 22005 - City of Tuscaloosa
Infrastructure
Conception
$4,300,000 CJ est. value
Tuscaloosa, AL 35405

Hanna Steel Manufacturing Plant Addition
Addition, Demolition, Infrastructure - 9,000 SF
Design
$10,000,000 CJ est. value
Tuscaloosa, AL 35401

Benjamin Barnes YMCA Construction Project
New Construction, Infrastructure
Bidding
$10,230,000 CJ est. value
Tuscaloosa, AL 35401

Snow Hinton Park - Site Improvements Phase One
Infrastructure
Bidding
$901,000 CJ est. value
Tuscaloosa, AL 35405

Oliver-Barnard and Tuomey Halls Renovations and Addition - University of Alabama
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Tuscaloosa, AL 35401

RFP Construction Manager - Medical/Psychiatric and Minimum-Security Dormitory addition
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Tuscaloosa, AL 35401

Law School Drainage Improvements, UA Project
Infrastructure
Results
$1,196,485 CJ est. value
Tuscaloosa, AL 35405

RFQ Contractor - Flint River Drive Parking Lot Improvements
Infrastructure
Results
$497,776 CJ est. value
Tuscaloosa, AL 35404

2021 American Rescue Plan Act, Meter Replacement Project- Contract A, B, C
Infrastructure
Construction
$421,268 CJ est. value
Buhl, AL 35446

Element Hotel / Tuscaloosa
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Tuscaloosa, AL 35401

Peninsula Subdivision
New Construction, Infrastructure
Pending Verification
$3,910,000 CJ est. value
Tuscaloosa, AL 35406

Digester Mixing Upgrades - 62240280 - 21055 - City of Tuscaloosa
Renovation
Conception
$700,000 CJ est. value
Tuscaloosa, AL 35401

Chick-fil-A #4634 / Tuscaloosa
New Construction, Infrastructure - 4,878 SF
Bidding
$1,500,000 CJ est. value
Tuscaloosa, AL 35404

RFQ - New Construction of an Athletics Competition Arena Project Located on Campus
New Construction, Term Contract, Infrastructure
Post-Bid
$183,000,000 CJ est. value
Tuscaloosa, AL 35401

Last Updated 08/08/2023 06:12 PM
Project Title

Northport Wtp Chemical System Improvements

Physical Address View project details and contacts
City, State (County) Northport, AL 35476   (Tuscaloosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A summary of the work items is included below: Upgrade of existing chemical systems to include a new covered storage area, new bulk chemical storage for Alum, Fluoride, and Sodium Hypochlorite, day storage tanks for Alum and Sodium Hypochlorite, Sodium Hypochlorite chemical feed skids, small diameter chemical piping, valves, fittings, and appurtenances, instrumentation, general site improvements and yard piping, and electrical improvements. A cashier's check or bid bond payable to the Owner in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interest of the Owner will thereby be promoted. The work of constructing the project will be let under one Contract if an award should be made; and the Owner reserves the right to select the Bid considered by the Owner to be in the best interest of the Owner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents