Similar Projects
On-Call Landfill Administration Buildings HVAC System Maintenance
Term Contract
Bidding
Yaphank, NY 11980

HVAC System Replacement
Alteration
Bidding
Holbrook, NY 11741

HVAC/Refrigeration Replacement & Maintenance
Term Contract
Post-Bid

HVAC Duct Cleaning and Mold Remediation and Abatement Services
Term Contract
Post-Bid
Stony Brook, NY

Remove, Supply and Install Two Inverters/Heat Pumps at USCB STA Fire Island
Term Contract
Results
$25,000 est. value
Babylon, NY 11702

Combination of Bond Phase 2,3 and 4 - HVAC
Alteration
Results
Bohemia, Ronkonkoma, NY 11716

North Babylon U.F.S.D. - Unit Ventilator Replacement
Alteration
Bidding
North Babylon, NY 11703

Green Heating and Cooling East Hampton Town Campaign
Alteration
Post-Bid
East Hampton, NY

Packaged Terminal Air Conditioner (PTAC) Units
Term Contract, Alteration
Results
Stony Brook, NY

South Ocean MS Unit Ventilator Reconstruction
Renovation, Alteration
Bidding
$1,750,000 est. value
Patchogue, NY 11772

Annual Requirements Contract - Piping Insulation
Term Contract, Alteration
Post-Bid
Yaphank, NY

Auditorium at East Islip Middle School
Alteration
Results
Islip Terrace, NY 11752

Upgrade Electrical and Steam Distribution for New Ship
Alteration
Bidding
Bronx, NY 10465

Annual Requirements Contract Cooling Tower Systems Cleaning Testing And Disinfecting
Term Contract, Alteration
Post-Bid
Yaphank, NY

Replace Heating System
Alteration
Results
$500,000 to $1,000,000 est. value
Babylon, NY 11702

Reported 01/27/2022 12:00 AM
Project Title

Repair of Boat House Furnace

Physical Address View project details and contacts
City, State (County) Babylon, NY 11702   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the removal and replacement of Armstrong Air LG14-280,000 BTU propane gas fired furnace, using existing gas lines, and electrical wiring. Remove and replace Beckett G-10 two-stage burner. Install three new ductwork for returns in ceiling with registers, tied-in to the existing ductwork. Install three (20"x20") return filters grills.

Details

Division 01 - General Requirements, Cleaning and Waste Management, Construction Waste Management and Disposal.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Furnaces, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents