Similar Projects
Wastewater Project 5 Quails Path Sanitary Sewer Line Replacement
Infrastructure
Bidding
Colleyville, TX 76034

M-584 Sanitary Sewer Interceptor Improvements (Segment 1 and Segment 2)
Infrastructure
Bidding
Fort Worth, TX

Water and Sanitary Sewer Improvements for South Beverly Street and Race Street
Post-Bid
Crowley, TX 76036

Del Paso Street Sewer Improvements
Post-Bid
$423,810 est. value
Euless, TX 76040

Sanitary Sewer Main 257, Upper & Middle Village Creek Parallel Relief Main Part 2B
Results
$7,100,000 est. value
Fort Worth, TX

Brookwood Hills Stream and Sanitary Sewer Rehabilitation
Results
TX 76021

Harmony School of Innovation Infrastructure
Infrastructure
Post-Bid
Fort Worth, TX 76133

Water and Sanitary Sewer Replacement Contract 2019 WSM-A
Results
Fort Worth, TX 76102

Rehabilitation of Sanitary Sewer Manholes
Infrastructure
Post-Bid
Arlington, TX

CSG - Rehabilitation of Sanitary Sewer Manholes FY 21
Results
Arlington, TX 76004

Small Diameter Sewer Cleaning Services
Term Contract
Post-Bid
Fort Worth, TX

Public Works Water and Sewer Services Installations
Term Contract
Results
$97,700 est. value
Keller, TX 76244

Water and Sewer Service Installations
Term Contract
Post-Bid
Keller, TX

Water and Sanitary Sewer Replacement Contract 2019 WSM-B
Results
$4,933,473 est. value
Fort Worth, TX 76102

2017 Sanitary Sewer Stream Crossings Phase 2 (Bardin Road)
Infrastructure
Post-Bid
$1,100,000 est. value
Arlington, TX 76018

Last Updated 03/03/2022 09:03 AM
Project Title

Water and Sanitary Sewer Rehabilitation on Horne Street

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76107   (Tarrant County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water and Sanitary Sewer Rehabilitation construction on Horne Street from West Vickery Blvd. to Camp Bowie Blvd. The major work will consist of the (approximate) following: Water: 1. 8,598 LF 8" DIP Water by Open Cut 2. 1,478 LF 8" PVC DR-14 Water by Open Cut 3. 61 EA 8” Gate Valve 4. 8 EA Fire Hydrant. Sanitary Sewer: 1. 846 LF 8” DIP Sewer Pipe with Protecto 401 Coating 2. 1,640 LF 8" 160 PSI Pressure Rated PVC (ASTM-2241) Sewer Pipe 3. 1,889 LF 8" PVC SDR-26 Sewer Pipe 4. 20 EA 4’ STD DIA MH 5. 389 LF 6” to 8” Pipe Enlargement.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents