Similar Projects
Codman Yard Expansion and Improvements
Infrastructure
Bidding
$73,000,000 est. value
Dorchester, MA

Rail Grinding Services on the MBTA Rapid Transit and Light Rail System
Infrastructure
Bidding
Boston, MA

Lowell National Historical Park - Trolley System Replacementof Wooden Catenary Poles with Steel Poles
Post-Bid
$250,000 to $500,000 est. value
Lowell, MA 01852

Sweeney-Spring Interlocking Design
Post-Bid
Washington, DC - Boston, MA

Commuter Rail Track On-Call Construction Services
Term Contract
Results
Less than $12,998,811 est. value
Boston, MA

Silver Line Courthouse Station Northeast Headhouse
Results
Less than $14,500,000 est. value
Boston, MA 02210

Railroad Crossing and Traffic Island Maintenance
Post-Bid
Scituate, MA

Worcester Union Station Accessibility and Infrastructure Improvements
Results
$39,255,000 est. value
Boston, Worcester, MA

Green Line Train Protection System Wayside Installation
Infrastructure
Post-Bid
$16,733,000 est. value
Newton, MA

On-Call Track, 3 (RL/OL - Systemwide Modernization)
Results
$25,000,000 est. value
Boston, MA

Design-Build Services for the MBTA Critical Communications Implementation and P25 Plan for Transit Police - Rail and Bus (CCTRB) Project
New Construction, Infrastructure
Post-Bid
Boston, MA

Removal and Disposal of Rails and Ties
Infrastructure
Results
$80,000 est. value
Medfield, MA

Trolley Pole Replacement Project
Term Contract
Post-Bid
Cambridge, Lowell, MA 01852

Rail-115 Re 39` HT Head Hard
Infrastructure
Post-Bid
Boston, MA

South Attleboro Station Improvements
Infrastructure
Post-Bid
$41,000,000 est. value
Burlington, MA

Last Updated 05/19/2022 11:53 PM
Project Title

Install Approximately 8.1 Track Miles of 136RE Continuous Welded Rail (CWR)

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Transportation
Sub-Category(s) Railroad/Subway
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major work to be completed in this contract is to install approximately 8.1 track miles of 136RE continuous welded rail (CWR). In addition, this contract includes, but is not limited to, the installation of one new turnout, replacement of two existing turnouts, replacement of five private/farm crossings, surfacing and aligning of approximately 1.8 miles of track, spot tie replacement, and spot ditching

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents