Similar Projects
Hobson's Landing - Master Plan - Phase 1&2
New Construction - 490,508 SF
Construction
$10,000,000 CJ est. value
Portland, ME 040101

Big Moose Resort Ski Area Expansion
Renovation
Conception
$113,000,000 est. value
Greenville Junction, ME 04442

Herald Square Mixed-Use - Phase 1
New Construction, Infrastructure - 365,575 SF
Design
$300,000,000 est. value
Portland, ME 04101

Scarborough Downs Phase 2
New Construction
Design
Scarborough, ME 04074

Shipyard Brewery Redevelopment
New Construction, Demolition - 114,000 SF
Construction
$10,000,000 CJ est. value
Portland, ME 04101

The Lockwood Hotel
New Construction - 10,250 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Waterville, ME 04901

Time & Temperature Building Project
New Construction - 202,000 SF
Design
$75,000,000 est. value
Portland, ME 04101

Last Updated 07/19/2022 11:09 PM
Project Title

Stardust Motel Renovations - Phase I

Physical Address View project details and contacts
City, State (County) Houlton, ME 04730   (Aroostook County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of the following, which is not an all-inclusive list: The grading and installation of drainage and concrete slab in an existing 140'x20' basement. Installation of sump pumps and associated piping and electrical circuits. Removal and replacement of a 5' wide concrete sidewalk at unit entrances and associated pavement patching.

Details

Hotel/Motel, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents