Similar Projects
Community Center - Town of Amherst
New Construction, Infrastructure
Conception
$8,010,000 CJ est. value
Amherst, NH 03031

Blaine Junkyard Redevelopment
New Construction
Conception
Manchester, NH 03102

Market & Main Bedford
New Construction - 356,050 SF
Design
$70,000,000 est. value
Bedford, NH 03110

Chestnut Street Apartments
Renovation
Design
Manchester, NH 03101

Collins Road Civil Scope Project
Infrastructure
Bidding
$600,000 CJ est. value
New Ipswich, NH 03071

Collins Road Civil Scope Project
Infrastructure
Bidding
$600,000 CJ est. value
New Ipswich, NH 03071

Woodland Village - Phase 1
New Construction
Post-Bid
Goffstown, NH 03045

Woodland Village Phase II
New Construction
Post-Bid
Goffstown, NH 03045

2021 Paving
Infrastructure
Results
Brookline, NH

Site Improvements and MOV Canopy Construction
Infrastructure
Results
$960,000 est. value
Hillsboro, NH 03244

Streif Elderly Housing
New Construction - 56,400 SF
Construction
$6,000,000 est. value
Merrimack, NH 03054

Townhouses at Gateway Hills
New Construction - 122,304 SF
Construction
$10,000,000 CJ est. value
Nashua, NH

Robinson Road Industrial Development
New Construction, Infrastructure - 50,400 SF
Pending Verification
$27,000,000 CJ est. value
Hudson, NH 03051

Robinson Road Industrial Development
New Construction, Infrastructure - 50,400 SF
Pending Verification
$27,000,000 CJ est. value
Hudson, NH 03051

Canal/Franklin/Main Street Intersection Improvements - City of Nashua
Infrastructure
Conception
Nashua, NH

Last Updated 11/10/2022 02:31 PM
Project Title

Sundial Avenue Apartments

Physical Address View project details and contacts
City, State (County) Manchester, NH 03103   (Hillsborough County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $60,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new apartment complex. As of November 2022, this project is in the early planning stages, and waiting to receive a one-year time extension approval from the Manchester Planning Board. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to fourth quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

6 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents