Similar Projects
Constitution Plaza
New Construction, Infrastructure
Conception
$10,500,000 CJ est. value
Fort Myers, FL 33967

North Area 1 Irrigation Potable Water and Wastewater - CN136317 - City Of Cape Coral
Renovation, Infrastructure
Conception
$50,000,000 CJ est. value
Cape Coral, FL 33904

Pre-K Addition at G. Weaver Hipps Elementary School
Addition
Design
$4,500,000 to $6,000,000 est. value
Lehigh Acres, FL 33936

Construction Management Services for Franklin Park Elementary School Rebuild Construction
New Construction
Design
$55,000,000 to $65,000,000 est. value
Fort Myers, FL 33916

ADA Ramp and Mat Improvements
Infrastructure
Bidding
$2,731,702 CJ est. value
Cape Coral, FL 33904

Gateway Boulevard and Griffin Drive Roundabout - Construction
Infrastructure
Bidding
$300,000 CJ est. value
Gateway, FL 33913

Tanglewood Elementary School Parking Lot Renovations
Renovation - 11,800 SF
Post-Bid
$300,000 est. value
Fort Myers, FL 33919

Academic Village Site
Infrastructure
Post-Bid
$13,265,000 est. value
Cape Coral, FL

Construction Management Services New Construction of "J" Elementary and Expansion of "MM" Middle School
New Construction, Addition
Results
$51,000,000 to $55,000,000 est. value
Lehigh Acres, FL 33936

Building Official Services for Franklin Park Elementary School Rebuild Construction
New Construction
Results
$55,000,000 to $65,000,000 est. value
Fort Myers, FL 33916

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Multi Commercial Development - Sitework
Infrastructure
Construction
Lehigh Acres, FL 33971

Cape Coral Yacht Club Renovations - City of Cape Coral
Infrastructure
Pending Verification
$60,000,000 CJ est. value
Cape Coral, FL 33904

RV One Superstore of Fort Myers
New Construction, Infrastructure - 30,000 SF
Pending Verification
$6,750,000 CJ est. value
Fort Myers, FL 33905

North Area 3 Irrigation Potable Water and Wastewater - CN336317 - City Of Cape Coral
Renovation, Infrastructure
Conception
$211,473,398 CJ est. value
Cape Coral, FL 33904

Last Updated 10/18/2022 11:02 AM
Project Title

Franklin Park Elementary School Rebuild - Temporary Campus

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33905   (Lee County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $7,500,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

(As of October 18, 2022, construction is underway. This negotiated project consists of relocating existing portable trailer classrooms and all supporting MEPs and ADA ramps to a new location, with improved site drainage, new parking lot, covered walk-way aluminum canopies, new fencing, playground relocation and site utilities. The project consists of relocating existing portable trailer classrooms and all supporting MEPs and ADA ramps to a new location, with improved site drainage, new parking lot, covered walk-way aluminum canopies, new fencing, playground. The project site is located at 1320 Marsh Avenue, Fort Myers, FL 33905 Trades invited to bid: Sitework (to include sodding) Concrete Underground Utilities Decorative Metals Landscaping Asphalt Paving Pavement Markings Fencing Electrical Fire Alarm Low Voltage Plumbing HVAC Playground Relocating Classroom Trailer Relocating Carpentry Framing & Drywall Roofing Doors, Frames and Hardware Painting Specialties Window Treatments Cleaning Anticipated Substantial Completion = November 16, 2022 Substantial Completion to Final Completion = 30 calendar days

Details

35,150 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents