Similar Projects
66” Siphons, 96” Interceptor and Almond Creek River Crossing Cleaning Project
Post-Bid
$824,000 est. value
VA 23219

Drainage Improvement Project Lakecrest Court and Greenlee Road
Post-Bid
Roanoke, VA

Sandy Run Regional Park Shoreline Stabilization
Results
$25,000 est. value
Fairfax Station, VA

Border Road Drainage Improvements Phase 2B
Results
Chesapeake, VA

Original Building Demolition and Box Culvert Construction
Construction
$6,075,000 est. value
Arlington, VA 22201

Warsaw Downtown Revitalization Project
Post-Bid
Warsaw, VA 22572

Corrugated Metal Pipe and Bands
Results
Wise, VA 24293

Design-Build Services for Stream Restoration at Glade Creek at Gus Nicks Boulverd
Post-Bid
Roanoke, VA 24011

Benchmark Road Slope Stabilization
Results
Fredericksburg, VA 22408

Design-Build for Stream Restoration Lick Run at Roanoke Regional Airport
Post-Bid
$681,937 est. value
Roanoke, VA 24011

Baltimore Harbor Maintenance Dredging - York Spit
Results
$10,000,000 to $25,000,000 est. value
VA

Piney Branch Stream Restoration - Construction
Post-Bid
Vienna, VA 22160

Storm Water Ditches at Riverheads Elementary School
Results
Staunton, VA 24401

S--Bio Retention Pond Service
Post-Bid
Hampton, VA 23667

Cape Charles Harbor Fixed Breakwater - Phase 1
Results
Cape Charles, VA 23310

Last Updated 04/20/2021 02:24 PM
Project Title

The Ballston Pond Retrofit Project

Physical Address View project details and contacts
City, State (County) VA   (Arlington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to clearing and grubbing, water management, earthwork including exporting unsuitable material and importing suitable material, grading, observation platform, concrete work, asphalt pavement, porous pavement, erosion and sediment control, landscaping and tree planting, fence and various other improvements. Two years of post-construction plant maintenance is also included in this project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents