Similar Projects
Hurst Hall Renovation - Western State College
Renovation
Conception
$3,900,000 CJ est. value
Gunnison, CO 81231

Andrew G. Clark Building Building Upgrade - Colorado State University
Renovation
Design
$135,000,000 CJ est. value
Fort Collins, CO 80521

Veterinary Medicine And Education Facilities Expansion and Remodel / Colorado State University
Addition, Demolition, Build-out, Infrastructure - 300,000 SF
Design
$278,000,000 CJ est. value
Fort Collins, CO 80526

RFP Developer - 211 West College Drive Conceptual Public-Private Partnership (PPP)
Infrastructure
Bidding
$20,000,000 CJ est. value
Durango, CO 81301

RFP Construction Manager - CM/GC Services / Dining & Student Services Building (Chauvenet Hall)
New Construction, Infrastructure - 38,000 SF
Bidding
$37,500,000 CJ est. value
Golden, CO 80401

CU Denver College of Engineering, Design, and Computing Building and North Classroom Renovations
New Construction, Renovation, Infrastructure - 72,000 SF
Post-Bid
$58,739,000 CJ est. value
Denver, CO 80204

CU Denver College of Engineering, Design, and Computing Building and North Classroom Renovations
New Construction, Renovation, Infrastructure - 72,000 SF
Post-Bid
$58,739,000 CJ est. value
Denver, CO 80204

University of Colorado Anschutz
Renovation
Results
$200,000 to $230,000 est. value
Aurora, CO 80045

Weight Room Fueling Station
Renovation
Results
$431,527 CJ est. value
Boulder, CO 80309

Technical College Welding Shop Installation Services
Renovation
Construction
$150,000 CJ est. value
Denver, CO 80204

Colorado Mountain College Steamboat Springs Student Housing
New Construction, Infrastructure
Construction
$12,100,000 CJ est. value
Steamboat Springs, CO 80487

Henderson Museum Renovation - University of Colorado
Renovation
Pending Verification
$20,747,500 CJ est. value
Boulder, CO 80304

Guggenheim Geography Building Capital Construction and Renovation - University of Colorado
Renovation - 22,908 SF
Pending Verification
$29,173,500 CJ est. value
Boulder, CO 80302

Fitz Bldg 3rd Reno CSPH
Renovation
Bidding
$149,500 CJ est. value
Aurora, CO 80045

Performing Arts Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$43,000,000 CJ est. value
Grand Junction, CO 81501

Last Updated 10/13/2023 07:04 AM
Project Title

Research1 North - Vivarium Air Valve Replacement Phase 1 of 2

Physical Address View project details and contacts
City, State (County) Aurora, CO 80045   (Adams County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,847,537 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project has been Rebid. Estimated Construction Cost: $1,463,271 (Fixed Limit of Construction Costs, FLCC) (Ph 1) Total Project Budget: $1,847,537 (combined hard and soft costs) (Ph 1) The University of Colorado Anschutz Medical Campus seeks a highly qualified Architecture/Engineering team to provide engineering design, construction documentation and contract administration services to replace the terminal box air valve system that serves the vivarium in Research 1 North (R1N). Phase 1 of this project is currently funded through the state-controlled maintenance program (FY 2023-2024). Controlledmaintenance funding for Phase 2 of the project is expected to be received in FY 20242025. It's anticipated that the selected A/E team for Phase 1 will continue on with Phase 2. Although the majority of this project involves M/E/P engineering design, it is desired that the team also include architectural services to fully coordinate the construction documents and specifications, as well as lead construction administration. CU Anschutz medical research relies on modern vivarium facilities to ensure compliance with NIH grants policy and regulations. Laboratory animal facilities present complex building maintenance and repair challenges. Vivarium HVAC systems are critical to program operation and AAALAC accreditation. Protocol violations affecting HVAC operation can result in suspensions, fines, funding problems, program disruption, and facility loss of use. Inadequate HVAC systems risk loss of accreditation and faculty recruitment concerns. The R1N vivarium ventilation system currently has operational problems requiring replacement of the terminal box air valve system. The air valves precisely control temperature and ventilation and resides in the interstitial space above the vivarium. There are 145 supply air valves with reheat coils, 114 general exhaust air valves, 39 cage rack exhaust valves, 16 Biosafety Cabinet exhaust valves and 5 other miscellaneous exhaust valves. The existing air valves are pressure independent venturi style with internal plunger and spring. These air valves do not have airflow measurement, therefore separate crossring airflow stations were provided to report airflow to the building automaton system (BAS). The potential to disrupt operations or vivarium program delivery associated with this building system is intermittent. The two-phase solution includes new equipment to replace the ventilation system serving the vivarium space. Each of the two phases of this project will complete approximately half of the total required scope of work. Design and construction will need to be planned and coordinated between each phase to maintain continuous and uninterrupted vivarium operation throughout. The interstitial space above the vivarium is comprised of catwalks to service the ventilation system components and other equipment. Most of the air valves are located adjacent to the catwalk. Therefore, most air valves are readily accessible for replacement. However, there are approximately 35 air valves that are too far away from the edge of the catwalk and will require scaffolding or other platforms to be installed to access air valves for replacement. Depending on how the contractor arranges scaffolding, there will likely need to be 20-30 areas of scaffolding or platforms constructed in order to replace these hard-toreach air valves. The reheat coils do not have true isolation valves since "valve packs" were used where balancing valves are also intended for isolation. Therefore, drain-down of the heating water system and additional "quadrant" isolation valves are recommended to be installed for future isolation without having to affect other areas of the vivarium. Control valves for the coils, while still operational are beyond their useful life. Reheat coils will be replaced in the same location to minimize the cost of accessories. Point of Contact: Name: Robert Holzwarth Phone: (720) 854-4664 Email: robert.holzwarth@cuanschutz.edu Please prepare submittals as follows: a. Submittals should not exceed 40 double-sided pages (letter size, 8-1/2" x 11") of content. b. Cover page and section title pages do not count towards the 40-page limit. c. Please do not use smaller than 10-point fonts for readability. d. Submittals should be ordered and contain the five (5) distinct sections as outlined in section II. SUBMITTAL REQUIREMENTS. Separate each section by a title page. e. PDF submittal size is limited to 25 MB by CU Anschutz submission website. Mandatory Pre-submittal Conference: To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled. The intent of this conference is to tour the site and to have University of Colorado Anschutz Medical Campus staff available to discuss the project. Firms preparing submittals must attend and sign-in in order to have their submittals accepted.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents