Similar Projects
Reported | 02/11/2022 12:00 AM |
Project Title | Rubble Placement |
Physical Address | View project details and contacts |
City, State (County) | (Holmes, Walton, Washington Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Aggregates |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $250,000 |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Improvements under this Work Document-Driven Contract consist of the placement of Bank and Shore Rubble as well as Ditch Lining Rubble along various roadways in Holmes, Walton, and a portion of Washington Counties. This rubble will be used to fill, re-contour and restore eroded slope and ditch bottoms Section 0001 Asphalt Repair (Mechanical) (Tn) 0104- 10- 3 Sediment Barrier Lf 300.000 0104- 11- Floating Turbidity Barrier Lf 1,500.000 0120- 2- 2 Borrow Excavation, Truck Measure Cy 200.000 0339- 1- Miscellaneous Asphalt Pavement Tn 10.000 0530- 3- 3 Riprap- Rubble, Bank and Shore Tn 750.000 0530- 3- 4 Riprap, Rubble, F&i, Ditch Lining Tn 40.000 0530- 3- 9 Riprap- Rubble, Remove Existing and Reinstall - Push Button Only Sf 4,000.000 0530- 74- Bedding Stone Tn 40.000 0570- 1- 2 Performance Turf, Sod Sy 500.000 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |