Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

11Th Street Apartments
New Construction
Design
Mebane, NC

Rowan-Cabarrus Community College South Campus Parking Lot Repairs
Infrastructure
Bidding
Concord, NC

Pedestrian Walkway - Phase III
Infrastructure
Bidding
$800,000 to $110,000 est. value
Trent Woods, NC

MUP and Sidewalk Improvements Old Fayetteville Road/Village Road/Town Hall Drive
Post-Bid
Leland, NC 28451

Navaho Drive Sidewalk Project (Formal)
Post-Bid
Raleigh, NC 27602

Bike, Sidewalk and Pedestrian Improvements
Results
Less than $1,090,168 est. value
Cary, NC 27513

Guy Ford Road River Access Parking Lot
Results
Boone, NC 28607

Chick-Fil-A Sitework
Addition
Construction
Raleigh, NC 27607

Parkwood Avenue Streetscape Improvements Project
Infrastructure
Bidding
$4,567,000 est. value
Charlotte, NC 28263

West Marion Street Streetscape Project
Post-Bid
Shelby, NC

2020 Annual Needs Sidewalk Maintenance Contract
Results
Less than $558,800 est. value
Wilmington, NC 28402

Downtown Streeteries
Infrastructure
Bidding
Raleigh, NC 27601

Police Department Building and Parking Expansion
Post-Bid
Smithfield, NC 27577

Avon Creek Greenway Extension
Results
Gastonia, NC

Reported 01/21/2022 12:00 AM
Project Title

Mountain Island Lake Parking Lot Project Phase 1

Physical Address View project details and contacts
City, State (County) Mount Holly, NC 28120   (Gaston County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be located on property owned by the City of Mount Holly located off of route 273 and Mountain Island Road. The partially cleared site should be graded to promote sheet flow drainage across the area. Relocation of the existing gate facility will be included. An asphalt access road, 2 handicap spaces, and 3 city parking spaces shall be constructed adjacent to the proposed parking lot. The parking lot will consist of compacted gravel access and parking spaces. The parking spaces will need to be delineated by concrete wheel stops. Phase 1 completion will consist of a total of 83 parking spaces, a split rail fence, and a dumpster pad. In accordance with the attached Mountain Island Lake Parking Lot Project Phase 1 plans and specifications dated January 3, 2022 sheets 1-7.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents