Similar Projects
Installation of HVAC Equipment Servicing the IT/Server Room
Alteration
Bidding
Toms River, NJ 08753

Maintenance and Repair of HVAC Systems
Term Contract
Post-Bid
Bayville, NJ 08721

Industrial Heat Treatment Salt Bath Furnace
Post-Bid
Lakehurst, NJ

Chiller Maintenance Services
Term Contract
Results
Toms River, NJ 08754

Construction of Shorrock Street Water Treatment Plant HVAC Replacement
Results
$275,000 est. value
Lakewood, NJ 08701

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Upgrades Brackman Middle School
Results
$1,730,000 est. value
Barnegat, NJ 08005

Hydrogen Peroxide Air Filtration & Disinfection Products
Post-Bid

Annual Maintenance for HVAC Systems in Various Buildings
Results
$90,715 est. value
Manahawkin, NJ 08050

HVAC Installation and Drip Pan for STA Barnegat Light
Post-Bid
Barnegat Light, NJ

Municipal Building HVAC Replacement
Results
Bay Head, NJ 08742

Weatherization Energy Conservation Project 2021-2022
Post-Bid

Heating Systems Annual Service and Repairs
Term Contract
Results
Toms River, NJ 08754

Installation of 11 low voltage UV sanitizing modules in existing HVAC equipment
Alteration
Post-Bid

HVAC Improvements to the Pop Warner Complex Cheer Barn
Results
Manchester Township, NJ 08759

Reported 01/12/2022 12:00 AM
Project Title

Cooling Tower Replacement at Administration Building 1

Physical Address View project details and contacts
City, State (County) Toms River, NJ 08753   (Ocean County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 12/06/21
Owner View project details and contacts
Architect View project details and contacts
Description

Administration Building #1 is a 30,775 sq. ft. building built in 1964. It has been determined that its current cooling tower is beyond reasonable repair and requires replacement. The new cooling tower shall be model Evapco, or equivalent, induced down draft counter flow cooling tower capable of cooling an estimate of 540 GPM of water from 95.0° F to 85.0° F / at 78.0° F entering wet bulb temperature. It is the responsibility of the awarded vendor to size the cooling tower to the existing building conditions.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents