Similar Projects
Twins Auto of Dublin - Storage and Display Area Expansion
New Construction, Demolition
Conception
Dublin, OH 43017

Building Infrastructure Repairs - C38437 - Columbus State Community College
Renovation
Conception
$15,000,000 CJ est. value
Columbus, OH 43215

Bright Road Senior Housing & Healthcare Residences
New Construction, Infrastructure - 420,000 SF
Design
$55,000,000 CJ est. value
Dublin, OH 43017

South High Street Apartments Addition
New Construction, Infrastructure, Renovation - 5,000 SF
Design
$25,000,000 CJ est. value
Columbus, OH 43215

RFQ Contractor - Upper Arlington Community Center
New Construction, Infrastructure - 147,000 SF
Bidding
$55,000,000 CJ est. value
Upper Arlington, OH 43212

RFQ Design - Ag Engineering - HVAC Upgrade
Renovation
Bidding
$1,747,310 CJ est. value
Columbus, OH 43210

Waterman Dairy Improvements
Renovation
Post-Bid
$2,253,000 CJ est. value
Columbus, OH 43215

Ross Opr/Or Expansion
Renovation, Addition
Post-Bid
$9,692,655 est. value
Columbus, OH

Atwell - ADL Simulation Lab
Results
Less than $3,000,000 est. value
Columbus, OH

Stores & Rec - Room Upgrades
Renovation - 2,415 SF
Results
Less than $464,280 est. value
Columbus, OH

WOSU Headquarters and Studios
New Construction, Build-Out - 115,000 SF
Construction
$32,000,000 est. value
Columbus, OH 43201

Residences at Eden Park
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Columbus, OH 43219

Castings Commerce Park
New Construction, Infrastructure - 815,000 SF
Pending Verification
$100,000,000 CJ est. value
Columbus, OH 43207

Chick-fil-A #4826 / Columbus
Demolition, New Construction, Infrastructure - 5,141 SF
Pending Verification
$800,000 CJ est. value
Columbus, OH 43214

Student Success Renovations - C38435
Renovation
Conception
Columbus, OH 43215

Last Updated 10/14/2022 12:02 PM
Project Title

Polaris - Cytogenetics Lab Expansion

Physical Address View project details and contacts
City, State (County) Columbus, OH 43210   (Franklin County)
Category(s) Education, Heavy and Highway, Laboratory
Sub-Category(s) College/University, Laboratory, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

In compliance with Section 153.08 of the Ohio Revised Code and Section 153:1-8-01 of the Ohio Administrative Code, Bids for this Project are being received, opened, and published through electronic means using the State's electronic bidding service. Bidders may submit requests for consideration of a proposed Substitution for a specified product, equipment, or service to the Architect/Engineer ("A/E") no later than 10 days prior to the bid opening. Additional products, equipment, and services may be accepted as approved Substitutions only by written Addendum. From time to time, the Commission issues new editions of the "State of Ohio Standard Requirements for Public Facility Construction" and may issue interim changes. Bidders must submit Bids that comply with the version of the Standard Requirements included in the Contract Documents. Prevailing Wage rates and Equal Employment Opportunity requirements are applicable to this Project. This Project is subject to the State of Ohio's Encouraging Diversity, Growth, and Equity ("EDGE") Business Development Program. A Bidder is required to submit with its Bid and with its Bidder's Qualifications form, certain information about the certified EDGE Business Enterprise(s) participating on the Project with the Bidder. Refer to Section 6.1.10 of the Instructions to Bidders. The EDGE Participation Goal for the Project is 5.0 percent. The Contracting Authority has a goal to provide 5% opportunity for EDGE certified companies to perform work on the Contracting Authority's prime contracts. Apparent Low Bidders that are incapable of identifying 5% of work on prime contracts for fulfillment by EDGE certified companies must complete all sections of the Demonstration of Good Faith form. The apparent low bidder shall thoroughly document its efforts to identify work for EDGE certified companies. The apparent low bidder may request the owner to waive the 5% participation goal in part or in total. The apparent low bidder shall submit a Request for Waiver on company letterhead. The Apparent Low Bidder shall address the following in its Request for Waiver: o Describe in overall terms the conditions that prevented the Apparent Low Bidder from providing 5% of the work on the prime contract to EDGE certified companies, o Identify what percentage of the work on the prime contract is suitable for performance by EDGE certified firms, o Request the Contracting Authority to waive the 5% participation goal in part or in total. Trade Estimate General Contract.......................................................$2,200,000.00 Alternate G-1...............................................................$866,000.00 Alternate G-2...............................................................$138,000.00 The Bidder may be subject to a Pre-Award Affirmative Action Compliance Review in accordance with Section 123:2-5-01 of the Ohio Administrative Code including a review of the Bidder's employment records and an on-site review. The Bidder must indicate on the electronic Bid Form, the locations where its services will be performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D related to providing services only within the United States. Failure to do so may cause the Bid to be rejected as non-responsive. Bidders are encouraged to be enrolled in and to be in good standing in a Drug-Free Safety Program ("DFSP") approved by the Ohio Bureau of Workers' Compensation ("OBWC") prior to submitting a Bid and provide, on the Electronic Bid Form with its Bid, certain information relative to their enrollment in such a program; and, if awarded a Contract, shall comply with other DFSP criteria described in Section 1.6 of the General Conditions.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents