Similar Projects
US-270B - Grade, Drain and Surface
Infrastructure
Conception
$15,000,000 CJ est. value
Shawnee, OK 74801

US-270B - Grade, Drain and Surface
Infrastructure
Conception
$15,000,000 CJ est. value
Shawnee, OK 74801

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

US 270 - Grade,Drain,Bridge and Surface
Infrastructure, Renovation
Design
$4,000,000 CJ est. value
Shawnee, OK 74801

Absentee Shawnee Police Safety Center
Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

Absentee Shawnee Police Safety Center
Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Slabjacking and Subsealing Services
Infrastructure
Results

Resurface (Asphalt) - US-177
Infrastructure
Results
OK

Grade, Drain, Bridge and Surface - I 40
Infrastructure
Design
$20,500,000 CJ est. value
Tecumseh, OK 74873

Dozer Services at Hulah and Osage WMA
Infrastructure
Bidding
$200,000 CJ est. value
Tribbey, OK 74878

Absentee Shawnee Police Safety Center
New Construction, Infrastructure - 5,581 SF
Post-Bid
$2,000,000 CJ est. value
Shawnee, OK 74801

Cammack Street Gravity Relief Line
Demolition, Infrastructure
Results
$626,331 CJ est. value
Shawnee, OK 74804

Utilities - SH 102
Infrastructure
Design
$420,000 CJ est. value
Tecumseh, OK 74873

Last Updated 11/14/2022 06:02 AM
Project Title

Sanitary Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Tecumseh, OK 74873   (Pottawatomie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Section 13, T-9-N, R-3-E, Pottawatomie County 17,908 L.F. of 8" HDPE DR-17 Sanitary Sewer (Bursting) 765 L.F. of 12" HDPE DR-17 Sanitary Sewer (Bursting) 28 EA. 4' Dia. Manhole Removal & Replacement 47 V.F. Extra Depth Manhole 297 EA. Service Connections Pre-Installation Video Inspection Post-Installation Video Inspection Testing Bypass Pumping Sediment & Erosion Control Traffic Control Mobilization Some areas of asphalt removal and replacement Each bid must be submitted in a sealed envelope addressed to City of Tecumseh at 114 N. Broadway, Tecumseh OK 74873. Each sealed envelope containing a bid must be plainly marked on the outside as a "Bid for Sanitary Sewer Rehabilitation" and the envelope should bear on the outside the bidder's name, address and license number, if applicable, and the name of the project for which the bid is submitted. Each bid must be accompanied by a bid bond payable to the Owner for five percent of the total amount of the bid. As soon as the bid prices have been compared, the Owner will return the bonds of all except the three lowest responsible bidders. When the agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. The bid bond of the successful bidder will be retained until the payment the payment bond and performance bond and/or statutory bond have been executed and approved, after which is will be returned. A certified check may be used in lieu of the bid bond. A performance bond and a payment/statutory bond, each in the amount of 100 percent of the contract price and each with a corporate surety approved by the Owner, will be required for the faithful performance of the contract. Attorneys-in-fact who sign bid bonds are payment bonds and performance bonds must file with each bond a certified copy of their Power of Attorney bearing the effective date. The party to whom the contract is awarded will be required to execute the agreement and obtain the performance bond and statutory bond within ten (10) calendar days from the date when Notice of Award is delivered to the bidder. The Notice of Award shall be accompanied by the necessary agreement and bond forms. In case of failure of the bidder to execute the agreement, the Owner may consider the bidder in default, in which case the bid bond accompanying the proposal shall become the property of the Owner. The Owner, within ten (10) days of receipt of acceptable performance bond, statutory bond and agreement signed by the party to whom the agreement was awarded, shall sign the agreement and return to such party an executed duplicate of the agreement. Should the Owner not execute the agreement within such period, the bidder may, by written notice, withdraw the signed agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the Owner. The Notice to Proceed shall be issued within ten (10) days of the execution of the agreement by the Owner. Should there be reasons why the Notice to Proceed cannot be issued within such period, the time may be extended by mutual agreement between the Owner and contractor. If the Notice to Proceed has not been issued within the ten-day period or within the period mutually agreed upon, the contractor may terminate the agreement without further liability on the part of either party. The Owner may make such investigations as deemed necessary to determine the ability of the bidder to perform the work and the bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by or investigation of such bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the agreement and to complete the work contemplated therein. A condition or qualified bid will not be accepted. Award will be made to the lowest responsible bidder. All applicable laws, ordinances and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout. All bids must include assurances that the following provisions will be complied with: 1. Federal Labor Standards Provisions, US Department of Labor, 29 CFR 5; 2. Section 3 Final Rule became effective on November 30, 2020 and is codified at 24 CFR part 75. The regulation simplifies the Section 3 requirements and establishes that Section 3 requirements apply to housing rehabilitation, housing construction, and other public construction projects assisted under HUD programs that provide housing and community development financial assistance when the total amount of HUD assistance to the project exceeds a minimum funding threshold. The regulation also improves alignment with current business practices by requiring the reporting of labor hours rather than new hires. The Benchmark Notice establishes the current numeric goals for compliance with Section 3 requirements.3. Section 109 of the Housing and Community Development Act of 1974, which assures that no person shall, on the grounds of race, color, natural origin or sex, be excluded from participation in, be denied the benefits of or be subjected to discrimination; 4. Certification of Non-Segregated Facilities, which assures the bidder does not maintain or provide any segregated facilities; comply with the terms of Section 504 and the American with Disabilities Act 5. Equal Opportunity Provisions - Executive Order 11246, as amended, which assures non-discrimination; 6. Minority Business Enterprise and Women Business Enterprise provisions which encourage minority-owned business and women-owned businesses to bid on the project; 7. Assurances that surety companies executing bonds appear on the Treasury Department's list and are authorized to transact business in the State where the project is located. 8. System for Award Management (SAM) registration and a DUNS number is required for CDBG Bidders (Prime contractors) in order to be awarded projects by the CDBG program.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents