Similar Projects
Southport Village Mixed Use
New Construction, Infrastructure
Conception
$120,000,000 CJ est. value
Spartanburg, SC 29306

Zimmer Lease Buildings
New Construction, Infrastructure - 36,000 SF
Conception
$9,000,000 CJ est. value
Cowpens, SC 29330

Martens RV Park
New Construction, Infrastructure - 87,120 SF
Design
$1,400,000 CJ est. value
Lyman, SC 29365

Carolina Pregnancy Center / Spartanburg
New Construction, Infrastructure - 10,000 SF
Design
$1,800,000 CJ est. value
Spartanburg, SC 29306

Taxiway A Rehabilitation Project
Infrastructure
Bidding
$900,000 CJ est. value
Spartanburg, SC 29306

Accessibility Improvements Outside Burgess Student Center
Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Spartanburg, SC 29301

Belcher Road Bridge Replacement Project
Renovation, Infrastructure
Post-Bid
SC

Country Club Road Utilities Relocation Project
Infrastructure
Post-Bid
$1,250,000 CJ est. value
Spartanburg, SC 29302

Clearing of Lot
Infrastructure
Results
Spartanburg, SC 29306

Waspnest Road Bridge Project
New Construction, Infrastructure
Results
Wellford, SC 29385

Spartanburg- Lake Edwin Johnson Dam Repair and Improvement
Infrastructure
Construction
$550,000 CJ est. value
Spartanburg, SC 29302

Pine Valley Subdivision
New Construction, Infrastructure
Construction
$200,000,000 CJ est. value
Boiling Springs, SC 29316

Clifton Mill No. Two / Clifton Mill Residences
Demolition, New Construction, Infrastructure - 252,349 SF
Pending Verification
$60,000,000 CJ est. value
Spartanburg, SC 29307

East Main Mixed Use
New Construction, Infrastructure - 2,000 SF
Pending Verification
$75,000,000 CJ est. value
Spartanburg, SC 29306

New Animal Shelter - County of Spartanburg
New Construction, Infrastructure - 18,994 SF
Conception
$17,400,000 CJ est. value
Roebuck, SC 29376

Last Updated 03/30/2023 12:18 PM
Project Title

RFP Cleveland Park Bridge Improvement Project

Physical Address View project details and contacts
City, State (County) Spartanburg, SC 29303   (Spartanburg County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $151,310 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Approximate award date 03/02/2023 05:00 PM (UTC-05:00) Eastern Time (US & Canada)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Retaining Walls, Planting.
Division 33 - Utilities.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents