Similar Projects
On-Site Automatic Gates Maintenance and Repair Services
Term Contract
Post-Bid
Austin, TX 73301

Security Fencing and Gate Completion 2019/ 2020 for Harlingen High School, Harlingen South High School and Cano Freshmen Academy
Post-Bid
$140,000 est. value
Harlingen, TX 78550

Perimeter Fence
Results
Less than $25,000 est. value
Del Rio, TX 78840

Districtwide Fencing
Term Contract
Results
$3,500,000 est. value
Dallas, TX

2020 Tennis Court Fence Replacement
Post-Bid
The Woodlands, TX 77382

Balcones Fence Replacement
Results
$25,000 to $100,000 est. value
Marble Falls, TX 78654

Chain Link and Iron Fencing Installation and Repair of Existing Fences
Post-Bid
Less than $25,000 est. value
Irving, TX 75060

Electromagnetic Gates, Field Fence and Maintenance Service
Results
Dallas, TX

Fence Material - Tarver Recreation Center
Post-Bid
Laredo, TX 78043

LRGV Fencing 2019
Results
$475,000 to $500,000 est. value
Santa Rosa, TX

Fence Repairs Lift Station - Wastewater Collection
Post-Bid
Laredo, TX 78045

Replacement of Fences at 21 Single Family Homes
Results
$73,852 est. value
Dallas, TX

Fencing
Post-Bid
Pflugerville, TX 78660

Pedestrian Gates
Results
El Paso, TX 79905

Greenbelt Improvements
Post-Bid
Katy, TX 77083

Last Updated 01/14/2020 11:18 AM
Project Title

Arlington Municipal Airport Improvements

Physical Address View project details and contacts
City, State (County) Arlington, TX 76018   (Tarrant County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $774,718
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of the Airport’s perimeter fence, including: Base Bid – Removal of existing fence on north, east, and south sides and northwest corner of airport (approx. 12,700 LF); installation of security fence on east and south sides and northwest corner of airport (approx. 10,980 LF); installation of wildlife exclusion fence on west and north sides of airport (approx. 7,450 LF); installation of one (1) automatic sliding security gate; installation of eight manual access vehicle swing gates and 9 pedestrian swing gates; except for the southwest portion of fence line, the proposed fence line will generally follow the same alignment as the existing fence line, meaning the existing fence will need to be removed prior to the installation of the proposed fence; associated and complimentary work. Additive Alternate No. 1 – Wildlife Deterrent Fence Skirt for Wildlife Exclusion Fence (approx. 7,450 LF). Additive Alternate No. 2 – 18" Wide x 6" Deep Concrete Base for Wildlife Exclusion Fence (approx. 7,450 LF). Additive Alternate No. 3 – 18" Wide x 6" Deep Concrete Base for Security Fence (approx. 10,375 LF). Additive Alternate No. 4 – Clearing and Grubbing along Fence Lines (approx. 4,908 LF).

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents