Similar Projects
District Wide Security Upgrades, Paving Projects and Chiller
Post-Bid
Clinton Township, MI 48038

Eastpointe Memorial Library Air Handling Unit Replacement
Post-Bid
Eastpointe, MI 48021

Roseville - Mechanical Renovations - BP07
Results
Roseville, MI

SJ Data Center Cooling Upgrades
Results
Clinton Township, MI

Recirculating Air in Test Cells at Detroit Arsenal, Warren, MI
Post-Bid
$1,000,000 to $5,000,000 est. value
Warren, MI

Lakeview High School Pool/Gym/Cafeteria Areas Temperature Controls Replacement
Results
Saint Clair Shores, MI

MERV-13 Filters
Post-Bid
Warren, MI 48089

Lakeview Public Schools Pool and Gym Improvement_Bp3
Results
Saint Clair Shores, MI 48081

USCG Replace Furnaces at CG Airsta Detroit, Mt. Clemens, MI
Post-Bid
Mount Clemens, MI

Straight Rail Vehicle Exhaust Removal System
Results
Mount Clemens, MI 48043

2020 Admin HVAC
Post-Bid
Warren, MI 48089

HVAC Unit Replacements
Results
Sterling Heights, MI

Memorial Library HVAC Improvements
Post-Bid
Eastpointe, MI 48021

Food Warehouse Freezer Addition and Renovations Project
Renovation, Addition - 1,325 SF
Results
Clinton Township, MI

HVAC and Mechanical Products
Term Contract
Post-Bid

Last Updated 10/27/2020 02:19 PM
Project Title

Fraser Senior Activity Center RTU Replacement Project

Physical Address View project details and contacts
City, State (County) Fraser, MI 48026   (Macomb County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $33,210
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide material and labor cost to replace rooftop units as indicated in the drawings and specifications. Mechanical contractor shall provide a separate price for the replacement of each unit on the bid form. In addition, there are two alternates. Alternate #1: Provide the material and labor cost to remove all roof mounted gas piping supports. Replace with specified roof mounted pipe support. Alternate #2: Provide the material and labor cost to prepare gas pipe and paint the gas piping system with specified paint on the roof.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents