Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Full-Service Mechanical Maintenance
Bidding
Denver, CO

TOSV Snowmelt Boiler Project
Bidding
Snowmass Village, CO 81615

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Walk In Cooler
Post-Bid
Golden, CO 80401

SB 267 Repair/Upgrade to Mechanical and Electrical Systems
Results
Less than $155,000 est. value
Fruita, CO 81521

H--Boiler Lifespan Assessment
Results
Grand Junction, CO 81501

Secondary Building Water Heater Replacement
Bidding
Dove Creek, CO

Sb267 Replace Water Softners Bldg 118
Post-Bid
Pueblo, CO 81003

Fleet Management Exhaust Recovery System Install
Results
Less than $100,000 est. value
Loveland, CO 80537

Full and Partial Industrial Boiler Retube/Repair
Bidding
Littleton, CO 80123

Rangeview Boiler Replacement
Post-Bid
Aurora, CO 80013

Seven Lakes Restroom Renovation
Results
$300,000 to $400,000 est. value
Loveland, CO 80538

2021 Bill Heddles Recreation Center Boiler Upgrade Project
Bidding
Delta, CO 81416

Last Updated 12/31/2020 05:26 PM
Project Title

Boilers 1, 3, 4, Terminal and Aob Pump Rooms Replacement

Physical Address View project details and contacts
City, State (County) Denver, CO 80249   (Denver County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project entails the removal of three boilers, which will be replaced with five new 20,000,000 British thermal unit (BTU) boilers as well as new pumps, variable frequency drives (VFDs), supporting electrical, structural, life safety, instrumentation and controls equipment. In addition, the Terminal and Airport Office Building (AOB) pump rooms will be replacing their three Hot Water (HW) and 3 Chilled Water (CW) pumps. They will be replaced with 4 HW and 4 CW pumps.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents