Similar Projects
Eastern Band of Cherokee Indians Masterplan
Renovation, Addition
Conception
Cherokee, NC 28719

Emilia's Acrobatics, Gymnastics and Cheerleading
Renovation - 20,000 SF
Design
Hendersonville, NC

YMCA and Housing
New Construction - 93,336 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28209

Multipurpose Indoor Sports Complex Project Funding
Post-Bid
NC

Renovation of the Ayden Arts and Recreation Gymnasium
Renovation
Post-Bid
Ayden, NC 28513

Fetzer Gym Renovations
Results
Chapel Hill, NC 27514

Catawba River Soccer Complex Phase III
Results
Morganton, NC 28655

Qubein Arena
New Construction
Construction
$100,000,000 est. value
High Point, NC

Westchester Country Day School
New Construction, Renovation - 50,481 SF
Construction
High Point, NC 27265

Calvert Sports Academy and Development Center
New Construction - 272,044 SF
Pending Verification
$10,000,000 CJ est. value
Holly Springs, NC

Turf Field and Parking
New Construction
Design
Huntersville, NC 28078

West Brunswick High School Baseball Hitting Facility
Post-Bid
Shallotte, NC 28470

W R Anderson Gym Renovation
Results
$225,000 est. value
Winston-Salem, NC 27107

Southern Wayne HS Competition Gymnasium
Construction
Dudley, NC

Field House
New Construction
Design
Huntersville, NC 28078

Reported 12/17/2019 12:00 AM
Project Title

Renovations to Girls Batting Facility West Brunswick High School

Physical Address View project details and contacts
City, State (County) Brunswick, NC 28479   (Columbus County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Obtain all required permits and pay all fees associated with this project. 2. Install construction fencing around project. 3. Remove existing fencing and post. Fencing to be saved to re install. Posts are to be 4. discarded. 5. Remove attached padding along field side of block wall. Padding to be saved to re install. 6. Demo existing block walls around batting structure. 7. Remove any debris from existing concrete pad. 8. Install #5 rebar vertically into existing concrete slab 2 feet on center, 4 inches from edge of 9. concrete slab. Epoxy to be placed around rebar to secure in concrete. 10. Install a forty four inch (44") tall wall around existing structure (50'x60'). Wall to be built using 8x16 CMU. Joints to be tooled. 11. Blocks cells where vertical #5 rebar passes through will be filled with concrete. 12. First run of CMU will have #5 rebar horizontally around the building and be tied in to the vertical rebar. 13. The first run of CMU is to be filled with concrete. 14. The final course of block will have #5 rebar run horizontally and tied to the vertical rebar. 15. Top of wall to be capped with 4 x 16 solid concrete block. 16. 2 1/2" Galvanized fence post are to be inserted into block wall at the spacing necessary to carry wind load of 150 mph. Post are to extend to the concrete slab. The block with posts inserted are to be filled with concrete. Top of posts are to be secured to existing steel structure. 17. Metal fencing to be re installed around structure. 18. Existing entry gate is to remain. 19. Existing gutters are to be removed and re installed upon completion of job. 20. Wind screen is to be attached to metal fencing around exterior of structure. 21. Block wall to be painted. Color chosen by owner. 22. Vinyl padding to be re installed along block wall facing softball field. 23. Surrounding grounds to be cleaned and will be left in same condition as before project start. 24. Job site to be cleaned and left safe at the end of every workday. 25. Contractor responsible for removal and disposal of all construction debris. 26. Portable toilet supplied by contractor. 27. The contractor or employees of the contractor shall not engage the students in conversation or physical activities.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents