Similar Projects
Parks and Streets Landscaping Maintenance
Term Contract, Infrastructure
Bidding
Aurora, IL 60506

Expressway Mowing North
Post-Bid

Expressway Mowing North
Post-Bid

7th Avenue Creek Construction Phase 1
Results
Saint Charles, IL

Prescribed Burn and Natural Area Maintenance Services
Term Contract
Results
Batavia, IL

Statewide Natural Areas Management
Term Contract
Post-Bid

Mill Creek Retention Sidewalk Repair
Results
Geneva, IL 60134

The Knoxville United Methodist Church Lawn Care
Post-Bid
Knoxville, IL 61448

Ellithorpe Road Culvert Replacement
Results
Burlington, IL 60140

Campus Landscaping Services
Term Contract
Post-Bid
Aurora, IL 60506

Improvement Consists of a Culvert Repair of the Structure (SN 045-0299)
Results
IL

Laurel Street Culvert Replacement
Post-Bid
Elgin, IL 60120

2021 HMS Culvert Replacement - Bid Release 4
Results
Hampshire, IL 60140

Milton Township - Mulberry Culvert Lining
Infrastructure
Post-Bid
Algonquin, IL

Landscape Maintenance of Rain Gardens and Miscellaneous Storm BMPS
Results
Aurora, IL

Last Updated 04/06/2022 01:47 PM
Project Title

Nelson Lake Marsh Revitalization

Physical Address View project details and contacts
City, State (County) Batavia, IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Landscaping, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located approximately 2,385 feet upstream (northeast) the confluence with Lake Run on parcel 11-25-300-13. All surrounding parcels within 250’ are owned by the Forest Preserve District of Kane County. Specifically, it is located in the NE Quarter of Section 25, Township 39N, Range 7E at Latitude 41.8316639°N and Longitude 88.3854861°W. Furnish all materials and perform all labor necessary to install a water management stop log control structure approximately 29' upstream from the existing pedestrian bridge over the Lake Run Nelson Lake Branch of Lake Run. The overall purpose of the proposed project is to add a structure in Lake Run Nelson Lake Branch in order to manage the water surface elevation upstream at Nelson Lake. The project consists of constructing a control structure approximately 29’ upstream from the existing pedestrian bridge over the Lake Run Nelson Lake Branch of Lake Run. The structure will consist of 2 – 3’ H x 4’ W pre-cast box culverts placed in stream with 1.25’ of stone fill and stainless steel stop log guides mounted on each upstream culvert face. There will be an option of putting in up to 4 – 6” aluminum stop logs on either upstream culvert end, for a total of 8 possible 6” stoplogs. The work will include dewatering, earth excavation and disposal, riprap placement, seeding/plantings, erosion control measures, and restoration of disturbed areas.

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents