Similar Projects
Hamilton Maintenance II Project
Infrastructure
Bidding
Wise, VA

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Solar Site Preparation Project for the Wise County Industrial Development Authority
Alteration
Post-Bid
$350,000 to $375,000 est. value
Wise, VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Dry Fork Landslide III Maintenance
Results
$28,000 to $45,000 est. value
VA

Precast Box Culvert Wise Residency
Infrastructure
Post-Bid
Bristol, Norton, VA

Lower Birchfield Drainage
Results
$11,000 to $25,000 est. value
Wise, VA 24279

Corrugated Metal Pipe and Bands
Infrastructure
Results
Bristol, Norton, VA 24202

Subgrade Stabilization
Infrastructure
Results

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Hdpe Pipe Liner
Infrastructure
Results

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

Concrete Pipe
Infrastructure
Results

Aluminum Arch Pipe
Infrastructure
Results

Aluminum Structural Plate Arch Pipe And Aluminum Structural Plate Headwalls - Fabrication, Delivery, Assembly And Installation Supervision
Infrastructure
Results

Last Updated 12/13/2021 10:38 AM
Project Title

Pinewood Forest Project

Physical Address View project details and contacts
City, State (County) Wise, VA 24293   (Wise County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work for the Pinewood Forest Project shall consist of mobilization of the contractor’s workforce and equipment, construction site preparation, installation of erosion and sediment controls, maintenance work on a drainage ditch to establish water flow and establish drainage control, installation of an underdrain structure, construction site surveys, excavation and regrading as necessary, revegetation, and clean up and repair of damage to the project site.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents