Similar Projects
Drilling of Wells and Test Borings
Infrastructure
Bidding
NY

Wellhead Treatment for 1,4-Dioxane at Plant No. 3
Alteration
Bidding
Huntington Station, NY 11746

Pumps-Furnish and Deliver Submersible Non-Clog Pumps Cornell 6NHTA
Term Contract
Post-Bid
Pomona, NY 10970

Pump Seals
Post-Bid
Yonkers, NY 10701

Merriewold Wellfield Improvements
Results
Blooming Grove, NY 10914

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

City of Batavia Wellfield Well C Expansion, Contract B: Well and Site Improvements
Infrastructure
Bidding
Batavia, NY 14020

Backwash Pumps and VFD`s Replacement for the Water Treatment Plant
Post-Bid
Oneonta, NY 13820

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

Boiler Room Sump Pump and Attic Catwalk
Infrastructure, Alteration
Bidding
Port Chester, NY

Sanitary Sewer Improvements/Replacement of Grinder Pumps
Post-Bid
Sand Lake, NY 12153

Town of Watson Water District #4 Extension #1
Results
Less than $6,000,000 est. value
Lowville, NY 13367

Water Plant Pump Replacement
Infrastructure
Bidding
Sharon Springs, NY 13459

United Wappinger Water District - Hilltop Well Connection
Post-Bid
Less than $320,000 est. value
Wappingers Falls, NY 12590

Complete Turnkey Rebuilding of an Existing Sulzer/Johnston Vertical Turbine Pump
Results
Millwood, NY 10546

Last Updated 09/29/2021 09:10 AM
Project Title

Creamery Wellhouse Renovation Project

Physical Address View project details and contacts
City, State (County) Hartwick, NY   (Otsego County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work generally includes: Contract No. TH1-G-2021 - General, consists of, but is not limited to include the reconstruction of the existing CMU wellhouse as well as the construction of a framed 22’x22’ addition, site work, equipment pads, and chemical feed system. Contract No. TH1-E-2021 – Electrical consists of, but is not limited to include the installation of a new electrical service, relocation of existing control panels, vfds, radio system, dialer system, furnishing a new emergency generator, all new interior and exterior lighting, including all new power and control conduits, conductors, switches, disconnects, and appurtenances, heating and ventilation equipment and all related electrical equipment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents