Similar Projects
Chlorination Updates - Hancock Well and Oak Street Well Projects
Bidding
Midvale, Sandy, UT 84094

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Water Treatment- Green Well
Post-Bid
Riverton, UT

Well No. 8 Chlorinator Replacement
Results
Salt Lake City, UT 84119

Refurbishment and Upgrade of Well #4
Results
Less than $100,000 est. value
West Jordan, UT

Drilling Rig and Services for Paradox Basin
Post-Bid
Salt Lake City, UT

Murray Park Well
Results
Less than $1,257,651 est. value
Murray, UT 84107

Walker Lane Well Rehabilitation
Post-Bid
Less than $2,000,000 est. value
Holladay, UT 84117

Kenilworth RR 1-A Well Plug
Results
$50,000 to $60,000 est. value
Salt Lake City, UT 84114

Well Plugging
Post-Bid
Salt Lake City, UT

Flat Iron Mesa Well House Construction Project
Results
Sandy, UT 84070

Well in Paradox Basin
Term Contract
Results
Salt Lake City, UT 84112

Pump-House Parts and Repairs
Term Contract
Results
Salt Lake City, UT 84190

Decker Main WWPS Pump Replacement - Phase 2
Results
Less than $450,000 est. value
West Valley City, UT 84119

Well Site Housing Units
Results
Salt Lake City, UT 84112

Last Updated 08/12/2020 03:47 PM
Project Title

Conductor Hole for Forge

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1) Scope of work a) This procurement is for a fixed-price (turnkey) operation to excavate a cellar, drill a hole (hereafter referred to as “16A(78)-32 conductor”) and to complete the hole as outlined in section 4. b) 16A(78)-32 conductor is to be vertical, 100-foot deep and a minimum of 30 inches in diameter. c) Contractor shall obtain all permits required for mobilization and demobilization. d) FORGE has been informed by the Utah DWR that no drilling permits are required for this work. e) Contractor shall include in its bid package a copy of its safety program, records of any safety incidents in the past two years (e.g., OSHA 300 reports), and its safety inspection checklist. f) Compliance with API and Utah Division of Occupational Safety and Health standards is required. FORGE may request UOSH field inspection. g) Any fishing operation is the responsibility and at the expense of Contractor. h) This document does not cover HSE issues – All HSE and spill procedures will be consistent with DOE approved HSE procedures and requirements.

Details

Division 02 - Existing Conditions, Existing Material Assessment, Existing Masonry Assessment, Masonry Assessment Drilling, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Excavation.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents