Similar Projects
I-75 Connector over NS and GTW RR - Michigan Department of Transportation
Demolition, New Construction, Infrastructure
Conception
$13,484,095 CJ est. value
Monroe, MI 48162

I-75 Connector over NS and GTW RR - Michigan Department of Transportation
Demolition, New Construction, Infrastructure
Conception
$13,484,095 CJ est. value
Monroe, MI 48162

Dunham Street Improvements
Infrastructure
Design
$1,767,953 CJ est. value
Dundee, MI 48131

Dunham Street Improvements
Infrastructure
Design
$1,767,953 CJ est. value
Dundee, MI 48131

Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb and Gutter and Pavement Markings on North Macomb Street
Infrastructure
Bidding
$719,000 CJ est. value
Monroe, MI 48162

Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb and Gutter and Pavement Markings on North Macomb Street
Infrastructure
Bidding
$719,000 CJ est. value
Monroe, MI 48162

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

High School Staff Parking Lot / Firestone Drive Asphalt Replacement
Infrastructure
Post-Bid
$300,000 est. value
MI

4.87 MI of Hot Mix Asphalt Cold Milling, Trenching and Resurfacing, Aggregate Shoulders and Pavement Markings on St. Anthony Road from Whiteford Center Road to Secor Road and Ida Center Road from Douglas Road to Lewis Avenue
Infrastructure
Results
MI

2.68 MI of Hot Mix Asphalt Cold Milling, Resurfacing, Aggregate Shoulders and Pavement Markings on Sumpter Road from Scofield Road to Stout Road
Infrastructure
Results
MI

2023 Bond - Airport Community Schools
Addition, Renovation, Infrastructure
Pending Verification
$64,240,000 CJ est. value
Carleton, MI 48117

Toyota Motor North America Laboratory Facility
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$47,700,000 CJ est. value
Milan, MI 48160

Azalia Solar Farm / Milan Township
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Dundee, MI 48131

Intersection Realignment, Construct 3 Way Stop, Solar Flash Assemblies, Reflective Post Sheeting and Pavement Markings on Palmer Road
Infrastructure
Bidding
$441,000 CJ est. value
Maybee, MI 48159

Monroe Consolidated Drain Improvements
New Construction, Infrastructure
Post-Bid
$2,342,874 CJ est. value
Monroe, MI 48161

Last Updated 10/02/2023 08:03 AM
Project Title

Dundee 2023 Road Maintenance Program

Physical Address View project details and contacts
City, State (County) Dundee, MI 48131   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $291,332 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of road maintenance including catch basin repair, curb and gutter replacement, and necessary asphalt patching. Specific work on each road consists mainly of the following: o Oak Street (mill and fill and overbanding and chip sealing) o Viking Drive (chip sealing) o Dundee Ridge Subdivision (overbanding) o Golf Ridge Subdivision (overbanding and micro-surface) o Pearl Street Parking Lot (overbanding and micro-surface) o Strawberry Street (overbanding and chip sealing) o Ridge Subdivision (overbanding and chip sealing) o Powell (overbanding and chip sealing) o Helle Drive (overbanding and chip sealing). All questions about the meaning or intent of the Bidding Documents are to be submitted via email only to Jennifer Chehab, P.E. at jennifer.chehab@spicergroup.com. All email questions must be received by 5:00 P.M. on Wednesday August 2, 2023. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received after 5:00 P.M. August 2, 2023 may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents