Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Bidding
$110,000 to $180,000 est. value

Fort Lewis Fire and Rescue Station 9 Paving
Infrastructure
Bidding
Salem, VA 24153

Smart Scale Intersection Improvements
Results
Less than $4,111,000 est. value
VA

Glade Creek Greenway, Phase 2A
Results
Less than $500,000 est. value
Vinton, VA 24179

2020 Plant Mix
Results
Less than $1,488,000 est. value

2020 Surface Treatment
Results
Less than $1,154,000 est. value

2020 Cape Seal
Results
Less than $891,000 est. value
VA

Smart Scale - Intersection Safety Improvements
Results
Less than $963,000 est. value
VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Smart Scale - Roadway and Safety Improvements
Results
Less than $4,821,000 est. value
VA

Salem Residency Patching and Shoulder Maintenance
Term Contract
Results

Water Activated Cold Patch
Term Contract
Results

I-81 Widening MM 136.6 to MM 141.8
Results
Salem, VA 24153

Pavement Repairs 0 - 400 Square Feet
Results
Hollins, VA

Reported 06/02/2021 12:00 AM
Project Title

Roanoke River Greenway Re-Paving in Southeast

Physical Address View project details and contacts
City, State (County) Roanoke, VA   (Roanoke County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Roanoke Valley Greenway network includes paved and natural surface trails in the City of Roanoke, the City of Salem, the Town of Vinton, Roanoke County and Botetourt County. The greenway network is part of the bicycle and pedestrian infrastructure for the region and increasingly provides connectivity to neighborhoods via sidewalks, bike lanes and on-road facilities. The backbone of the system is the Roanoke River Greenway, running west to east, which will eventually be over 30 miles long. Roanoke River Greenway will connect to the north-south greenways like Mason Creek, Lick Run, and Tinker Creek, which tie to the public lands and trail opportunities surrounding the Valley. The greenways and trails are avenues to get places without a car, a free training ground for athletes, a place to meet your neighbors, and an economic driver for the region.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents