Similar Projects
Bonneville Dam Sluiceway Gate Replacement
Renovation
Post-Bid
Cascade Locks, OR 97014

Willamette Falls Locks (WFL) Seismic and Safety Upgrades
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
West Linn, OR 97045

Reservoir Replacement Project at Detroit Lake State Park
New Construction
Results
$475,000 est. value
Detroit, OR 97342

McNary Lock & Dam - Structural Steel Heat Straightening
Renovation
Post-Bid
Umatilla, OR 97882

John Day Dam Turbine Runner Replacement and Generator Rewind Project - Industry Site Visit
Renovation
Design
$500,000,000 est. value
Rufus, OR 97050

McNary Lock & Dam - Stoplog Seals and Molds
Renovation
Post-Bid
Umatilla, OR 97882

Mcnary Navigation Lock Downstream Gate Gudgeon Anchor Replacement
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Umatilla, OR 97882

John Day Dam Turbine Runner Replacement and Generator Rewind Project - 90% Review
Renovation, Term Contract
Post-Bid
$500,000,000 est. value
Rufus, OR 97050

Fishhawk Lake Dam Spillway and Fish Passage Improvements
Renovation
Results
$3,500,000 to $3,900,000 est. value
Westport, OR 97016

Cougar Butterfly Valve Replacement
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Blue River, OR 97413

Reported 03/02/2022 12:00 AM
Project Title

McNary Drainage, Unwatering, and Equalization System Rehab

Physical Address View project details and contacts
City, State (County) Umatilla, OR 97882   (Umatilla County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction project entitled: McNary Drainage, Unwatering, and Equalization System Rehab: construction will occur at McNary Lock and Dam. - Replacing all unwatering and drainage pumps to include all non-embedded intake and discharge piping as well as all isolation valves. Diving in the tailrace will be required to temporary plug the unwatering pump discharge piping while isolation valves are replaced. The three unwatering pumps will be converted from 4160V to 480V with the installation of new transformers and motor control centers. Work within the unwatering and drainage sump will require the setup of temporary pumping to install new pump intakes and seismic bracing. - The blockage in the primary embedded 8-inch drainage header pipe that runs the length of the powerhouse (approx. 1400 feet) will be removed, and the temporary (non-embedded) PVC drainage header removed. - All 56 drain valves are to be replaced. Half of the drain valves are located at the bottom of 30-foot-deep valve pits. Valve work also includes the replacement of stem packing on twenty-six 24-inch equalization valves.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 22 - Plumbing, Facility Storm Drainage, Sump Pump Discharge Piping, Sump Pumps.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Utility Transformers.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Hydraulic Valves, Hydraulic Regulating Valves, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents