Similar Projects
Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Design
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Salt Storage, Generator and Sewer Connection Phase 2 (Plumbing & Electrical)
New Construction
Bidding
Less than $400,000 est. value
Carrollton, Hamel, Jerseyville, IL

Salt Storage, Generator and Sewer Connection Phase 2 (Plumbing & Electrical)
New Construction
Bidding
Less than $400,000 est. value
Carrollton, Hamel, Jerseyville, IL

Purchase and Delivery of LED Luminaires
Post-Bid
Carol Stream, IL 60188

Holiday Lighting and Decorating Services for the Mill Creek Special Service
Term Contract
Post-Bid
Geneva, IL

HVAC Equipment Replacement
Results
Evanston, IL 60201

Oswego Pump Station Electrical Upgrades
Renovation
Results
Oswego, IL 60543

Replace Hot and Cold Water Loops
Bidding
Less than $300,000 est. value
Ina, IL

Electrician Services
Term Contract
Post-Bid
IL

Maple Street Pumping Station Electrical Modifications
Renovation
Results
Des Plaines, IL 60018

MVCC Building H Natatorium RTU Replacement
Bidding
Tinley Park, IL

Electrical Services
Term Contract
Post-Bid
Geneva, IL 60134

AC Nielsen Tennis Center LED Lighting
Results
Winnetka, IL 60093

Levee 37 Pump Station 1 and 2 Standby Generator Installation
Bidding
Mount Prospect, IL 60056

HVAC and Plumbing Services for City of Urbana Facilities
Term Contract
Post-Bid
Urbana, IL 61801

Last Updated 01/13/2021 04:51 PM
Project Title

2021 HVAC & Electrical Upgrades

Physical Address View project details and contacts
City, State (County) Hoopeston, IL   (Vermilion County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of an electrical upgrade and addition of cooling at Maple, and John Greer Grade Schools. At Maple Grade School work shall include removing and replacing the existing electric meter, and providing power to new AC units, and providing new ductless heat pumps to serve twenty-one rooms. At John Greer Grade School work shall include providing connection to the existing main switch board and providing two new panels, providing power to new AC units, and providing new ductless heat pumps to serve twenty-three rooms.

Details

Division 03 - Concrete.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents