Similar Projects
Woodstock Xpress Park and Ride Lot Asphalt Paving
Infrastructure
Design
$300,000 est. value
Woodstock, GA 30189

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Routine Maintenance - D6
Results
Cartersville, Holly Springs, GA 30120

Streetscapes III Sidewalk Phase
Results
Woodstock, GA

Carver Lane and Signal Installation
Infrastructure
Post-Bid
Lebanon, GA

T32-D6-PPV-Bartow-Cherokee-114012
Results

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Roadway Resurfacing: Brookshire Subdivision
Infrastructure
Post-Bid
Woodstock, GA

LMIG Street Resurfacing
Results
College Park, GA 30337

Sixes ES Asphalt Walking Track
Alteration
Post-Bid
Canton, GA 30114

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 1 and 2
Results
Ellenwood, Forest Park, Lawrenceville, Macon, Morrow, Rex, Riverdale, Stockbridge, Union City, Warner Robins, Woodstock, GA 30294

Hot Mix Asphalt for Public Works
Term Contract, Infrastructure
Post-Bid
GA

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Last Updated 06/08/2022 03:25 AM
Project Title

Parkway Widening Phase II

Physical Address View project details and contacts
City, State (County) Holly Springs, GA   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The approximate extent and character of the Work is generally described as follows: Construction consisting of but is not limited to grading, curb and gutter, concrete sidewalks, concrete culvert extension, base and paving, and striping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents