Similar Projects
Chapter Building 2
New Construction - 156,000 SF
Conception
Seattle, WA 98105

Chapter Building 2
New Construction - 156,000 SF
Conception
Seattle, WA 98105

800 Stewart
New Construction - 702,349 SF
Design
$10,000,000 CJ est. value
Seattle, WA 98101

800 Stewart
New Construction - 702,349 SF
Design
$10,000,000 CJ est. value
Seattle, WA 98101

5600 Roosevelt Way
Renovation - 6,656 SF
Post-Bid
Seattle, WA 98105

2nd Avenue Mixed-Use Tower
Demolition, New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Seattle, WA 98101

KCSO Detective Unit Relocation
Renovation
Results
Seattle, WA 98104

Maintenance and Operations Center Moc-2
Renovation
Results
$1,780,000 est. value
Seattle, WA 98108

Spring District Block 6 Office Building Parking Garage Retail
New Construction, Build-Out - 2,160 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Spring District Block 6 Office Building Parking Garage Retail
New Construction, Build-Out - 2,160 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Dexter Avenue Apartment Building
New Construction, Demolition
Conception
Seattle, WA 98109

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

112th Office Towers
New Construction
Post-Bid
$10,000,000 est. value
Bellevue, WA 98004

Last Updated 02/02/2023 06:03 PM
Project Title

Microsoft Redwest South

Physical Address View project details and contacts
City, State (County) Redmond, WA 98052   (King County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Office, Parking Garage, Power Plant
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $154,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Offices, assembly area, thermal energy center, below grade parking garage. Office Building (Building N & O), Amenity Building (Building Q), Thermal Energy Center (TEC - Building S) As of February 2, 2023, the construction manager has been announced. A timeline for construction has not been provided, but it is unlikely before 2024.

Details

,, 549,630 SF - 5 Stories Above Grade, 237,431 SF. 5 Stories Above Grade, 240,861 SF. 56,332 SF. 15,006 SF. 4 Stories Below Grade, Parking Spaces, 2164 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents