Similar Projects
RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

Arrowhead Parkway Improvements - 11064 - City of Sioux Falls
Infrastructure
Design
$9,410,000 est. value
Sioux Falls, SD 57110

Dance Gallery / Sioux Falls
New Construction, Infrastructure - 20,000 SF
Design
$5,000,000 CJ est. value
Sioux Falls, SD 57105

Remove & Replace PCC Surfacing, Replace Str, Grading, Pipe Work
Infrastructure
Bidding
$32,629,000 CJ est. value
Humboldt, SD 57035

Remove & Replace PCC Surfacing, Replace Str, Grading, Pipe Work
Infrastructure
Bidding
$32,629,000 CJ est. value
Humboldt, SD 57035

Interstate Roadway Lighting Fixtures
Post-Bid
Sioux Falls, SD

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Phillips Avenue Improvements - 14th Street to 18th Street
Results
$1,327,780 est. value
Sioux Falls, SD

WholeStone Farms Pork Harvesting And Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Sioux Falls, SD 57104

1st Avenue Mixed Use Development
New Construction, Infrastructure - 5,000 SF
Pending Verification
$28,000,000 CJ est. value
Sioux Falls, SD 57104

Interchange Reconstruction
Infrastructure
Conception
$44,458,000 CJ est. value
Sioux Falls, SD 57103

High Friction Surface Treatment, Polymer Chip Seal, Deck Repair, Curb Repair, Approach Slabs, Replace Joint
Infrastructure
Design
$3,103,000 CJ est. value
Renner, SD 57055

Central Services Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,100,000 CJ est. value
Sioux Falls, SD 57104

Last Updated 09/26/2022 08:36 AM
Project Title

Upgrade Signals, Crossing Surface Rehabilitation, Approach, PE, CE

Physical Address View project details and contacts
City, State (County) Valley Springs, SD 57068   (Minnehaha County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Cliff Ave - by 20th St in Sioux Falls, BNSF RR, DOT #075474T Length 0.0 As of September 26, 2022, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Upgrade Signals, Crossing Surface Rehabilitation, Approach, PE, CE *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents