Similar Projects
Veterans Memorial Building Renovation Phases 1 & 2
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$350,000 CJ est. value
Grinnell, IA 50112

2022 Seal Coat Project
Infrastructure
Post-Bid
$500,000 est. value
Grinnell, IA

Pavement Planing/Grooving
Infrastructure
Results
IA

PCC Pavement - Grade and New
Infrastructure
Results
IA

T. I. P. REC New Headquarters-Phase 2
New Construction, Infrastructure - 53,340 SF
Post-Bid
$10,000,000 CJ est. value
Brooklyn, IA 52211

Alternate Pavement Types - Resurfacing
Infrastructure
Results
IA

Prairie Street and 2nd Avenue Water Main Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Grinnell, IA 50112

PCC Patching
Infrastructure
Results

5Th Avenue Reconstruction - State Street To East Street
Infrastructure
Results
Grinnell, IA

Sunset Street Reconstruction - 8Th Avenue To 11Th Avenue
Infrastructure
Results
Grinnell, IA 50112

Summer Street Inlay - 3Rd Avenue To 6Th Avenue
Infrastructure
Results
Grinnell, IA 50112

Penrose Street Inlay - North Of 4Th Avenue To 6Th Avenue
Infrastructure
Results
Grinnell, IA 50112

Granular Surfacing of Roadway
Infrastructure
Results

HMA Crack Filling
Infrastructure
Results
$80,000 est. value
IA

Jackson Street Reconstruction
Infrastructure
Results
$3,496,707 CJ est. value
Brooklyn, IA 52211

Last Updated 04/25/2023 03:33 PM
Project Title

Reconstruct Taxilane

Physical Address View project details and contacts
City, State (County) Grinnell, IA 50112   (Poweshiek County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

3-19-0039-019-2022-AIP (Design) & 3-19-0039-020-2023-AIP (Construction) The City of Grinnell reserves the right to reject any and all bids, to waive informalities or technicalities in any bid, and to enter into such contract, or contracts, as it shall deem to be to the best interest of the City of Grinnell. Work on the improvement shall commence upon approval of the contract by the City Council and as stated in the Notice to Proceed. All work on Phase 1 shall be completed in 25 working days. All work on Phase 2 shall be completed in 20 working days. All work on Phase 3 shall be completed in 15 working days. Work on Phase 1 must be completed prior to starting work on Phase 2. Work on Phase 2 must be completed prior to starting work on Phase 3. Liquidated damages as set forth in Section 00500 - Contract. Each bidder shall accompany its bid with bid security, as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon. The bidder ssecurity shall be in an amountequal to 5% percent of the total amount of the bid. The bid shall contain no condition except as provided in the specifications. Airports, Airport: Runways, Taxiways, Access Roads, Aprons, Concrete Pavement. Reconstruction of the Taxilane Thru the Apron with PCC Pavement.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents