Similar Projects
Last Updated | 02/11/2020 07:32 PM |
Project Title | Construction Manager (“CM”) Services |
Physical Address | View project details and contacts |
City, State (County) | CO (Summit County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CMGC PROJECT GOALS A. Replace Structure F-13-S_Minor with a new structure that meets 100-year design life criteria and qualifies for full funding through the Colorado Bridge Enterprise Program; B. Accommodate two-way traffic in new structure below I-70 and meet vertical clearance requirements; C. Facilitate and foster collaboration, communication, and partnerships among all members of the project team, including CDOT and the designer; D. Minimize Interstate traffic impacts and maximize safety of workers and traveling public during construction; E. Target construction season between June and October, one construction season duration is preferred but not required; F. Provide a structure that minimizes life cycle maintenance requirements; G. Minimize disturbance and/or impacts to the active landslide east of the structure; and H. Commit to the CMGC process. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |