Similar Projects
US Business 24 at MP 0.146
Bidding
Less than $1,000,000 est. value
CO

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Bridge Design, Construction, and Delivery
Post-Bid
Platteville, CO 80651

Bridge Expansion Joint
Post-Bid
Denver, CO 80204

Mesa-16-Q.5 Bridge Replacement
Results
Less than $1,672,643 est. value
Grand Junction, CO 81501

Design-Build Services for Willow Springs Ponds Pedestrian Bridge
Results
$75,000 to $200,000 est. value
Colorado Springs, CO 80905

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Hess Ranch Metropolitan District No. 6 – Filing 1 Bridges Project
Post-Bid
Parker, CO

Removal of Asphaltmat (Planing), Placement of Thin Bonded Polyester Concrete Overlay,Replacement of Bridge Joints and Bearings
Results
$5,000,000 to $20,000,000 est. value
Glenwood Springs, CO

Construction Management Services
Post-Bid
Englewood, CO 80110

High Line Canal Underpass at Hampden and Colorado
Results
$5,300,000 to $5,800,000 est. value
Denver, CO 80202

Wagon Creek Beekman Road Crossing
Post-Bid
San Luis, CO

I-76 over Clear Creek Bridge Rehabilitation Project on MP 2.901 on I-76
Results
$1,000,000 to $5,000,000 est. value
CO

Bridge Repair Project West 44th Ave over Clear Creek
Post-Bid
$300,000 to $350,000 est. value
Wheat Ridge, CO

1St Street Bridge Over Glic Rehabilitation
Results
Less than $1,500,000 est. value
Loveland, CO 80537

Last Updated 02/11/2020 07:32 PM
Project Title

Construction Manager (“CM”) Services

Physical Address View project details and contacts
City, State (County) CO   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CMGC PROJECT GOALS A. Replace Structure F-13-S_Minor with a new structure that meets 100-year design life criteria and qualifies for full funding through the Colorado Bridge Enterprise Program; B. Accommodate two-way traffic in new structure below I-70 and meet vertical clearance requirements; C. Facilitate and foster collaboration, communication, and partnerships among all members of the project team, including CDOT and the designer; D. Minimize Interstate traffic impacts and maximize safety of workers and traveling public during construction; E. Target construction season between June and October, one construction season duration is preferred but not required; F. Provide a structure that minimizes life cycle maintenance requirements; G. Minimize disturbance and/or impacts to the active landslide east of the structure; and H. Commit to the CMGC process.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents