Similar Projects
Miscellaneous Floor Maintenance and Repair for Delgado Community Colleges Campuses and Sites
Term Contract
Sub-Bidding
New Orleans, LA 70112

Purchase and Delivery of Inventory Storage Containers
Term Contract
Sub-Bidding
New Orleans, LA 70112

Yearly Service Contract for Fire Pump and Sprinkler Systems and Fire Suppression Systems Inspection and Maintenance Fire Alarm and Life Safety Systems Maintenance
Term Contract
Post-Bid
$45,000 CJ est. value
New Orleans, LA 70148

Elevator Maintenence
Term Contract
Post-Bid
New Orleans, LA 70119

Pool Water Pump and Motor
Term Contract
Sub-Bidding
New Orleans, LA 70112

Greenhouse Soil
Term Contract
Post-Bid
New Orleans, LA 70122

Disaster Debris Removal Services for New Orleans City Park
Term Contract
Post-Bid
New Orleans, LA 70124

Temporary Maintenance to the Firehouse Located at 2312 - 14 Louisiana Avenue
Term Contract
Post-Bid
New Orleans, LA 70115

Building and Sidewalk Pressure Washing and Window Cleaning
Term Contract
Post-Bid
New Orleans, LA 70112

West Power Complex Packaged Auxiliary Electrical Equipment Procurement
Term Contract
Post-Bid
New Orleans, LA 70112

RFQ/P - Capital Improvement Program Management Services
Term Contract
Post-Bid
New Orleans, LA 70112

Heating, Ventilation and Air-conditioning (HVAC) Preventative Maintenanace Services
Term Contract
Post-Bid
New Orleans, LA 70112

Shindaiwa BN Lawn / Golf / Turf-Statewide
Term Contract
Post-Bid
Baton Rouge, LA 70802

On Call Tree Removal and Pruning Services
Term Contract
Post-Bid
New Orleans, LA 70112

Waste Management Services
Term Contract
Post-Bid
New Orleans, LA 70126

Last Updated 06/05/2023 10:10 AM
Project Title

Criminal District Court Repairs - Isaac Repairs (FEMA-PA) (Re-Bid)

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70119   (Orleans County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $642,203 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**Project Cancelled** Criminal District Court Repairs - Isaac Repairs (FEMA-PA) (Re-Bid) Preform repairs as designated in these documents which include but not limited to : repair or replace dry wall ceilings and wall as approved by the Owner, replace damaged ceiling tile and grid, replace wall coverings, prime and paint water stained drywall (match existing ,color and paint), replace damage carpet with owner approve carpet, replace base molding (IE vinyl, rubber, woo), remove damage carpet padding and repair substrate as required to match existing, replace damaged vinyl composite tile (VCT) repair damaged plaster ceiling and walls, replace damaged trim molding on ceilings and walls as required, visible mold shall be tested by the City of New Orleans Environmental Consultant and a scope of remediation shall be directed to the contractor, sand prime and paint wood and plaster trim to match existing as approve by Owner, repair or replace window sills and trim prime, paint to match existing surrounding trim, Remove and replace window blinds and designated in this document as approved by Owner. All areas impacted my repair and construction work shall be thoroughly cleaned during and at the end of the repairs in the designated area as approved by the Owner. For all inquiries (except DBE), please direct them to the following Designated Purchasing Official: Name: , Address: 1300 Perdido Room 4W07, New Orleans, LA 70112, Telephone (504) 658-1510. E-mail:haley.slocum@nola.gov. ROJECT/WORK IDENTIFICATION A. The City of New Orleans (OWNER) prepared this document to conduct general repairs in the Criminal District Court Building at 2700 Tulane Avenue, New Orleans, LA ,70130 Provide all costs for the following scope. Costs shall include but not limited to OH&P, mobilization fees, engineering fees if applicable, demolition, disposal and all associated installation cost. All replacement materials shall be "in kind replacement" matching the materials at respective site.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents