Similar Projects
Last Updated | 05/07/2023 09:31 AM |
Project Title | Hot Mix Asphalt Base Crushing, Shaping, and Resurfacing, Aggregate Shoulders and Pavement Markings on Murner Road |
Physical Address | View project details and contacts |
City, State (County) | Bagley Township, MI 49735 (Otsego County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $536,122 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0.94 mi of hot mix asphalt base crushing, shaping, and resurfacing, aggregate shoulders and pavement markings on Murner Road from M-32 north to Five Lakes Road, Otsego County. This is a Local Agency project. Net classification required for this project is 583 Cb or 5836 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec STUL 69000 Job No 208352A Federal No 23A0394 MI DOT - 2305 038 - Hot Mix Asphalt Base Crushing, Shaping, and Resurfacing, Aggregate Shoulders and Pavement Markings on Murner Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |