Similar Projects
Hess Ranch Metropolitan District No. 6 – Filing 1 Bridges Project
Post-Bid
Parker, CO

Construction Management Services
Post-Bid
Englewood, CO 80110

Design-Build Services for Willow Springs Ponds Pedestrian Bridge
Results
$75,000 to $200,000 est. value
Colorado Springs, CO 80905

Removal of Asphaltmat (Planing), Placement of Thin Bonded Polyester Concrete Overlay,Replacement of Bridge Joints and Bearings
Results
$5,000,000 to $20,000,000 est. value
Glenwood Springs, CO

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Wagon Creek Beekman Road Crossing
Post-Bid
San Luis, CO

Construction Manager (“CM”) Services
Results
CO

Bridge Repair Project West 44th Ave over Clear Creek
Post-Bid
$300,000 to $350,000 est. value
Wheat Ridge, CO

High Line Canal Underpass at Hampden and Colorado
Results
$5,300,000 to $5,800,000 est. value
Denver, CO 80202

Steel Bridge Decking for Bridge No. 913
Post-Bid
Steamboat Springs, CO 80487

I-76 over Clear Creek Bridge Rehabilitation Project on MP 2.901 on I-76
Results
$1,000,000 to $5,000,000 est. value
CO

Castle Creek Bridge Replacement Project
Post-Bid
Aspen, CO 81611

1St Street Bridge Over Glic Rehabilitation
Results
Less than $1,500,000 est. value
Loveland, CO 80537

CR 491 Bridge
Post-Bid
CO

Dartmouth Avenue Bridge
Results
Englewood, CO 80222

Last Updated 05/05/2021 10:21 AM
Project Title

East 112th Avenue Over Fulton Ditch Bridge Replacement

Physical Address View project details and contacts
City, State (County) Commerce City, CO 80022   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The E. 112th Avenue Bridge is located approximately 2,800 feet west of US Highway 85 on E. 112th Avenue. The existing bridge carries nearly 3,000 vehicles per day and provides access to a number of industrial properties along Brighton Road, as well as numerous residential communities in the area. The bridge has been widened during its service life by 18’. The original bridge is a reinforced concrete double tee structure in which the original steel piles are severely deteriorated. The widened portion of the bridge is in fairly good condition and consists of slab girders on steel pilings. It is critical that the bridge structure be replaced to ensure the safety of users. The City of Commerce City is requesting bids for the replacement of this bridge. The new bridge is to be constructed over the Fulton Ditch. Construction will occur when water is flowing through the ditch. Prospective bidders are to adhere to attached Fulton Ditch Agreement.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents