Similar Projects
Costco / Guilderland
New Construction, Infrastructure - 158,202 SF
Conception
$20,000,000 CJ est. value
Albany, NY 12203

Porsche / Albany
New Construction, Infrastructure - 25,254 SF
Conception
$7,000,000 CJ est. value
Latham, NY 12110

Pepper Woods
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Latham, NY 12110

New York State Insurance Fund Office Building at Riverhill Center / Latham
Demolition, New Construction, Renovation, Infrastructure - 133,000 SF
Design
$37,275,000 CJ est. value
Latham, NY 12110

Facility Management
New Construction, Infrastructure - 32,310 SF
Bidding
$15,000,000 CJ est. value
Albany, NY 12205

Natural Playground Equipment
Infrastructure
Bidding
$70,000 CJ est. value
Bethlehem, NY 12158

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Clinton Market Collective
New Construction
Post-Bid
Albany, NY 12207

Z1DA--528A8-18-806 D-Stream Upgrade Site Prep (VA-20-00005571)
Results
$500,000 to $1,000,000 est. value
Albany, NY 12203

Transmission and Distribution Water Main Improvements
Results
Ravena, NY

South Pearl Street Group Living Shelter Addition
Addition, Demolition, Infrastructure - 30,972 SF
Pending Verification
$5,000,000 CJ est. value
Albany, NY 12202

Sherwood Estates Conservation Subdivision
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Latham, NY 12110

Hudson Valley Credit Union
Demolition, New Construction, Infrastructure - 4,600 SF
Conception
$1,500,000 CJ est. value
Latham, NY 12110

Route 9w Over Csx/cp Rail, Bridge Repair, Bin 1007570
Infrastructure
Design
$9,000,000 CJ est. value
Albany, NY 12209

Coeymans Landing and Joralemon Park Restrooms
Infrastructure, Renovation
Bidding
$180,000 CJ est. value
Coeymans, NY 12143

Last Updated 10/03/2022 11:10 AM
Project Title

2022 Water and Sewer Improvements

Physical Address View project details and contacts
City, State (County) Albany, NY 12210   (Albany County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $3,337,172 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 3, 2022, construction is underway. The general contractor is still accepting subcontractor pricing for select trades, for more specific information regarding bid opportunities, contact the general contractor directly. The project includes providing all labor, materials, machinery, tools, equipment and other means of construction to construct replacement of water mains and water services on Commerce Avenue, Crescent Drive, Lancaster Street, and S. Pearl Street, water services on Osborne Street, and sewer main and sewer laterals on Osborne Street. All work is to be completed by December 1, 2022. Bids received from Contractors other than those on the official Plan Holders List may not be accepted. Questions pertaining to the bid package should be directed to Mallory Wright, P.E., at (518)- 434-5306 or mwright@albanyny.gov. All bids must be made on the official Bid Form or an exact copy by reproduction thereof and enclosed in a sealed envelope per Article 15 of the Instructions to Bidders. This is a unit price bid as described in the Instructions to Bidders. No Bidder may withdraw his bid within forty-five calendar days after the actual date of the opening thereof. Installation of water main replacement on Crescent Dr., Commerce Ave., Lancaster St., and S. Pearl St. Replacement of existing sanitary sewer main on Osborne St. Replacement of water services from new main to meter on Crescent Dr. and Lancaster St., and replacement of water services from new main to curbox on S. Pearl St. and Commerce Ave. Pothole investigations of water services at curb boxes to identify water service material on both sides of curb stop to determine replacement schedule on Osborne St. Sewer main replacement on Osborne St. will require the reconnection of the new main to the sewer lateral from the sewer main to the face of the building. Work also includes the complete restoration of all surfaces. B. All additional work called out on plans. C. Provide Erosion and Sediment Control in accordance with the contract documents and New York State Department of Environmental Conservation Standards and Specifications for Erosion and Sediments Control, November 2016. D. Submission of samples, shop drawings for all material to be provided and as called for in the Specifications. E. Provide Project Schedule. Contractor must coordinate work with the Department of Water and Water Supply. F. Contractor must maintain the surrounding areas clear of debris for the duration of the project. Streets and sidewalks shall be broom swept using a closed sweeper as necessary. G. Contractor will utilize parking spaces available on street. Contractor shall submit proposed parking restrictions and lane closures as part of a Maintenance and Protection of Traffic plan to Traffic Engineering for approval prior to the start of construction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents