Similar Projects
Borax Drive Extension Construction
Bidding
Henderson, KY 42420

Asphalt Resurfacing
Bidding
KY

Production Avenue Road Extension and Utility Infrastructure
Post-Bid
Bowling Green, KY

Blacktop Repairs
Post-Bid
Burnside, KY

Boone County I-275 / Graves Road Interchange Design-Build
Results
KY

Asphalt Milling and Paving
Results
Less than $199,500 est. value
Erlanger, KY 41018

Streetscape Rebid
Bidding
Georgetown, KY

Beemon Lane Sidewalk/Conrad Lane Sidewalk/Idlewild Road Multi-Use Path
Post-Bid
Burlington, Florence, KY 41042

Old Lexington Pike (CR1121) Resurfacing and Widening
Results
KY

Shelby/Girard/Oblique Street Improvements
Alteration
Bidding
Less than $305,000 est. value
Florence, KY

JPC Pavement Repair Services
Post-Bid
KY

Asphalt Resurfacing
Results
KY

Asphalt Milling and Paving
Infrastructure
Bidding
Erlanger, KY

Waterborne Paint Striping
Post-Bid
Owensboro, KY

Taylor Mill 2020 Street Program
Results
Less than $289,750 est. value
Taylor Mill, KY

Last Updated 06/18/2021 03:27 AM
Project Title

Adkins-Baker-Belcher-Stewart Paving AML

Physical Address View project details and contacts
City, State (County) KY   (Pike County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $82,875
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Adkins-Baker-Belcher-Stewart Paving project contains four separate sites where paving work is to be done. All four are previous AML project sites, and each has an area where pavement has been left in poor condition. The Tammy Adkins site is located in Floyd County, Kentucky at coordinates 37° 24’ 23.721" N, 82° 38’ 38.274" W. There is approximately 0.1 miles of pavement starting at the Adkins residence and heading north on Rolling Stone Branch that will be re-done completely. Additionally, the next approximately 0.2 miles of Rolling Stone Branch Road until its intersection with KY-3380 will be patched where needed as directed by the Engineer. This total area is estimated to require 165 tons of pavement. The other three project sites are located in Pike County, Kentucky, and the areas to be paved are specified in the plan documents. The Donna Baker site is located at coordinates 37° 26’ 56.223" N, 82° 28’ 44.773" W and is estimated to require 30 tons of pavement. The Deborah Belcher site is located at coordinates 37° 16’ 29.33" N, 82° 26’ 42.06" W and is estimated to require 30 tons of pavement. The Johnny Stewart site is located at coordinates 37° 17’ 55.385" N, 82° 19’ 52.123" W and is estimated to require 250 tons of pavement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents