Similar Projects
Recreation Senior Center - City of High Point
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
High Point, NC 27260

Mackay Road - 158 - City of Greensboro
Infrastructure
Conception
$3,536,680 CJ est. value
Greensboro, NC 27407

The Resurgent Mixed-Use Development
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Greensboro, NC 27401

The Resurgent Mixed-Use Development
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Greensboro, NC 27401

High Point University Dental Building
New Construction, Infrastructure - 80,000 SF
Bidding
$43,000,000 CJ est. value
High Point, NC 27262

High Point University Dental Building
New Construction, Infrastructure - 80,000 SF
Bidding
$43,000,000 CJ est. value
High Point, NC 27262

Starbucks / Whitsett - Rebid
New Construction, Infrastructure - 2,485 SF
Post-Bid
$1,200,000 CJ est. value
Whitsett, NC 27377

RFP Construction Manager-at-Risk - New Student Recreation and Wellness Center
New Construction, Infrastructure
Post-Bid
$90,000,000 CJ est. value
Greensboro, NC 27411

Waterview Pump Station Improvements - Forcemain Extension
Infrastructure
Results
$2,767,305 CJ est. value
High Point, NC 27265

Asphalt Paving and Resurfacing as Needed on Secondary Roads in Western Guilford County
Infrastructure
Results
Greensboro, NC

2020 Bond - Visual and Performing Arts Elementary (VPA) - Guilford County Schools
Demolition, New Construction, Infrastructure
Construction
$33,505,256 CJ est. value
Greensboro, NC 27401

Battleground Avenue Self Storage / Greensboro
New Construction, Infrastructure - 90,750 SF
Construction
$8,000,000 CJ est. value
Greensboro, NC 27408

Wolfetrail Road Multi Residential
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Greensboro, NC 27406

Brigham Road Apartments
New Construction, Infrastructure
Pending Verification
$104,000,000 CJ est. value
Greensboro, NC 27409

A&Y Greenway Reconstruction and Resurfacing Project - 346 - City of Greensboro
Infrastructure
Conception
$600,000 CJ est. value
Greensboro, NC 27401

Last Updated 02/19/2024 12:17 PM
Project Title

Samet Drive Extension

Physical Address View project details and contacts
City, State (County) High Point, NC 27265   (Guilford County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2025 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $4,299,385 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract consists of providing personnel, equipment and materials to develop the Samet Drive Extension; basically including, the installation of approximately 2,500 linear feet of various size reinforced concrete storm pipe,1689 linear feet of 8" Ductile Iron Water Pipe, 175 linear feet of 8" Ductile Iron Sewer Pipe, 1,703 cubic yards of unclassified excavation for roadway development including approximately 7,500 tons of various grade asphalt, 4,555 linear feet of curb and gutter, 2,400 square yards of concrete sidewalk and driveway. A variety of other materials including structures, services, traffic control and additional items associated with the contract plans and specifications Questions due (In Writing) by January 4, 2024, by 12:00 PM. To: libby.rush@highpointnc.gov Responses provided by January 9, 2024

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents