Similar Projects
Last Updated | 12/07/2020 01:21 PM |
Project Title | One (1) Dust Collector System |
Physical Address | View project details and contacts |
City, State (County) | Aberdeen Proving Ground, MD 21005 (Harford County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To find sources that are qualified to meet the supplies/services as listed in section 11B. Note that the specific requirements in section C are subject to change prior to the release of any solicitation. B. The government requires one (1) each dust collector system that meets the following specifications: 1. The system(s) shall be connected to the Government’s existing three (3) sealed catch tanks for gas gun systems. 2. Capable of processing the air in a tank in under three (3) minutes, with minimum air flow of 500 cubic feet per minute. 3. Gas and dust particles shall not escape from the unit, with a minimum face velocity of approximately 150 feet per minute. 4. Self-cleaning to include a shaker attachment with only the remaining residue emptied into the collection container, to ensure the collection filter does not clog under normal use. 5. Capable of operating while technicians are inside the tank. 6. Approved for outdoor use and weather proof 7. Not exceed a five (5) foot width by 15 foot length foot print. 8. Covered by a minimum of a five (5) year warranty. 9. The contractor shall ensure that the filtration system is designed in a manner such that ARL personnel can replace filters without the use of specialized or unique equipment. The Contractor shall provide training or instruction to the TPOC on how to access, change, and secure the filter at the time of installation. Installation: 10. For installation, the Government will provide the Contractor with one (1) six (6) inch hose and blast gate for two (2) of the existing gas gun system tanks. The third (3) tank does not have a suitable connection port, and will not require the six (6) inch hose and blast gate, as it contains a free feed hose to insert manually once the tank is open while cleaning. 11. The Contractor shall deliver, uncrate, assemble, install, complete diagnostic testing, and provide instruction for use of the dust collector system to Aberdeen Proving Ground, Aberdeen, MD, 21005 12. The Contractor shall provide final site cleanup prior to departure. 13. The Contractor shall provide three (3) possible dates for delivery, installation, diagnostic testing and instruction within 10 days of contract award to the Government Technical Point of Contact (TPOC). The contractor shall ensure that delivery, installation, diagnostic testing, and instruction occur at the same time. The TPOC will approve a recommended date within five (5) days of contractor notification. 14. The Contractor shall provide Operation and Maintenance Manuals for all items listed in the salient characteristics. 15. The manuals shall include equipment descriptions, operating instructions, drawings, troubleshooting techniques, a recommended maintenance schedule, and any recommended filters or lubricants. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |