Similar Projects
Kearney Park - New Playground - City Of Watsonville
Infrastructure
Conception
$400,000 CJ est. value
Watsonville, CA 95076

Garfield Park Playground - c302217 - City of Santa Cruz
Infrastructure
Conception
$300,000 CJ est. value
Santa Cruz, CA 95060

Santa Cruz Jeep
Demolition, New Construction, Infrastructure - 5,602 SF
Design
$1,500,000 CJ est. value
Santa Cruz, CA 95060

Capitola Hotel
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Capitola, CA 95010

Green Valley Road Multi-Use Trail Improvements Project
Infrastructure
Bidding
$4,206,709 CJ est. value
Watsonville, CA 95076

Felton Diversion Pipeline Emergency Repair Project
Infrastructure
Bidding
$1,900,000 CJ est. value
Santa Cruz, CA 95060

Natural Bridges Apartments
New Construction, Infrastructure - 15,000 SF
Post-Bid
$6,000,000 CJ est. value
Santa Cruz, CA 95060

Redwood Road Pm 0.23 0.31 0.33 Storm Damage Repair Project
Infrastructure
Post-Bid
$680,740 CJ est. value
Santa Cruz, CA 95060

Rail Trail Segment 7 Phase 2
Infrastructure
Results
$10,853,016 CJ est. value
Santa Cruz, CA 95060

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

180 Permanent Supportive Housing Project
Demolition, New Construction, Infrastructure - 49,961 SF
Pending Verification
$14,000,000 CJ est. value
Santa Cruz, CA 95060

La Madrona Mixed-Use Development
New Construction, Infrastructure - 6,600 SF
Pending Verification
$99,000,000 CJ est. value
Scotts Valley, CA 95060

Frederick Street Park Picnic Area - c302216 - City of Santa Cruz
Infrastructure
Conception
$285,000 CJ est. value
Santa Cruz, CA 95062

Wildlife Tunnel Under Highway 17 - Santa Cruz County
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Santa Cruz, CA 95060

Septic System Improvements
Infrastructure
Post-Bid
$63,250 CJ est. value
Watsonville, CA 95076

Last Updated 08/08/2023 09:30 PM
Project Title

Felton Diversion Pipeline Emergency Repair Project

Physical Address View project details and contacts
City, State (County) Felton, CA 95018   (Santa Cruz County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,900,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bids will be received for a single prime contractor to repair a segment of the pipeline along that runs through the Felton Diversion. Procore Construction Software will be used for purposes of managing communication, submittals, testing results, and other documents throughout the construction contract. The contractor's document controller, cost and staff engineers are required to attend training from the construction management team for a minimum of three (3) days during mobilization. The software will be managed by the CM with access provided to the Contractor. The Contractor must be familiar with Procore Construction Software. The Project includes repair of an existing pipeline and bank stabilization at the south bank of Zayante Creek. The existing pipeline, 24-inch barwrapped concrete cylinder pipe (CCP), includes joint repairs and realignment for two 40-foot pipe sections. Bank stabilization includes rebuilding of the eroded creek bank and installation of rock slope protection. Additionally, work includes flow diversion, tree and debris removal, and all other work for the successful repair and realignment of the pipeline and creek protection against future erosion. Questions to be directed to Lewis Kay. All questions must be in writing and received a minimum of 5 business days prior to the opening date *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions and requests for information related to this Invitation for Bids should be directed to Lewis Kay (lkay@santacruzca.gov). All questions shall be in writing and received a minimum of 5 business days prior to the bid opening date.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents