Similar Projects
Atari Hotel
New Construction
Conception
$65,000,000 to $75,000,000 est. value
Phoenix, AZ 85003

Bungalows at Bell and Sarival
New Construction
Conception
Surprise, AZ 85374

Cesar Chavez Community Center
New Construction - 28,000 SF
Design
Less than $8,000,000 est. value
Laveen, AZ 85339

One Hundred Mill Hotel
New Construction - 150,683 SF
Design
Tempe, AZ 85281

Country Inn Suites
New Construction - 30,292 SF
Bidding by Invitation
$1,600,000 est. value
Scottsdale, AZ 85251

Sunland Flats
New Construction - 444,000 SF
Sub-Bidding
Phoenix, AZ 85041

Springhill Suites at Papago Plaza
New Construction - 72,795 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Scottsdale, AZ 85257

Home2 Suites
New Construction - 110,876 SF
Post-Bid
Phoenix, AZ 85085

Develop Hotel, Resort, Complimentary Retail, Conference Center Space
Results
Gilbert, AZ 85296

Ken Mcdonald Clubhouse
New Construction
Results
Tempe, AZ 85280

Desert Mountain Clubhouse & Gatehouse - Scottsdale
New Construction - 435 SF
Construction
$19,614 est. value
Scottsdale, AZ 85331

CopperWynd Redevelopment - Fountain Hills, AZ
Renovation
Construction
Fountain Hills, AZ 85268

Cerro Vista
New Construction
Pending Verification
Avondale, AZ 85018

Oasis at the Wells
New Construction - 663,086 SF
Pending Verification
$10,000,000 CJ est. value
Maricopa, AZ

Mercy Val Vista Center
New Construction - 99,330 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Gilbert, AZ 85297

Reported 12/17/2020 12:08 PM
Project Title

Hilton Hampton Inn and Suites

Physical Address View project details and contacts
City, State (County) Queen Creek, AZ 85142   (Maricopa County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club, Hotel/Motel, Swimming Pool(s)
Contracting Method
Project Status Building in Operation as of December 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

82,388 SF - 1 Swimming Pool(s), 1 Story Above Grade, New Construction, 1 Clubhouse/Social Club, 19,472 SF New Construction, 1 Hotel/Motel, 4 Stories Above Grade, New Construction 107 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents